offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Floating Wind›180 MW Floating Wind Project in Taiwan Passes Preliminary EIA Review
Floating Wind

September 30, 2024 · about 1 year ago

180 MW Floating Wind Project in Taiwan Passes Preliminary EIA Review

The Rui Li 1 floating offshore wind project, developed by a consortium comprising IX Renewables, Hexicon and GF Corporation, has passed the Environmental Impact Assessment (EIA) preliminary review. The consortium behind the project plans to enter the 180 MW Rui Li 1 into the upcoming floating wind d

1 minutes read
  • LinkedIn
  • X
  • Email
180 MW Floating Wind Project in Taiwan Passes Preliminary EIA Review

Taiwan’s upcoming tender aims to select projects that will serve as demonstrations for floating offshore wind in the Taiwan Strait, paving the way for the next wave of commercial-scale offshore wind tenders, which are expected to all be floating.

The winning wind farm is expected to be constructed around 2027/2029 and connected to the grid before the end of 2030.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Floating WindPlanning & Permitting

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

13 days ago

Floating Wind Farm Offshore France Reaches Full Power
Floating Wind

Floating Wind Farm Offshore France Reaches Full Power

17 days ago

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

13 days ago
Floating Wind Farm Offshore France Reaches Full Power
Floating Wind

Floating Wind Farm Offshore France Reaches Full Power

17 days ago
Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

19 days ago