offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›South Korean Floating Wind Project Inks Transmission Agreement with KEPCO
Business & Finance

October 10, 2024 · about 1 year ago

South Korean Floating Wind Project Inks Transmission Agreement with KEPCO

The 1,125 MW MunmuBaram floating offshore wind farm, being developed by Hexicon and Shell in South Korea, has entered into a Transmission Service Agreement (TSA) with Korea Electric Power Corporation (KEPCO). MunmuBaram is collaborating with two other developers on the grid connection facilities. Th

1 minutes read
  • LinkedIn
  • X
  • Email
MunmuBaram

The 1,125 MW project is planned to be built approximately 60 kilometres off the coast of Ulsan, in the southeast region of South Korea.

In February, Hexicon signed an agreement with Shell to acquire the full stake of the MumnuBaram project. From 1 July 2024, Hexicon is formally operating the wind farm. A change of control application has been submitted to the South Korean authorities that is currently being processed, Hexicon said.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersFloating WindSupply Chain

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

13 days ago