Cadeler has signed firm contracts for the transportation and installation of wind turbines as well as the foundations for ScottishPower Renewables’ East Anglia Two wind farm off the coast of the UK.
Under the contract, Cadeler will be responsible for the transportation and installation of both the foundations and 64 15 MW wind turbines for the East Anglia Two project.

