The offshore wind farm, the first large-scale privately led project of this kind in South Korea, is owned by a joint venture between SK E&S (51 per cent) and Copenhagen Infrastructure Partners (49 per cent).
The joint venture, Jeonnam Offshore Wind Power, obtained an Electricity Business License (EBL) for Jeonnam 1 in 2017 and entered a grid connection agreement with KEPCO, the state-owned utility in South Korea, allowing the project to connect to the grid in 2024.
