When it comes to Gode Wind 3 , the offshore wind farm comprises 23 Siemens Gamesa SG 11.0-200 DD turbines. The project is owned by Ørsted and Nuveen Infrastructure.
In terms of solar capacity, the increase was slightly higher than in the previous year, at 16.2 GW. Two-thirds of these new systems were installed on rooftops or building facades, with the rest on larger areas. At the end of 2024, the total installed solar capacity was 99.3 GW.
