offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Fixed-Bottom›Monopile Installation Nears as Offshore Work Starts at Baltic Power
Fixed-Bottom

January 21, 2025 · about 1 year ago

Monopile Installation Nears as Offshore Work Starts at Baltic Power

Preparatory and trial operations for offshore construction are underway at the Baltic Power offshore wind farm site in the Polish sector of the Baltic Sea, with several vessels involved, including Van Oord’s heavy-lift ship Svanen, in advance of the upcoming monopile installation work. Van Oord’s he

1 minutes read
  • LinkedIn
  • X
  • Email
baltic power svanen

Share this article

Preparatory and trial operations for offshore construction are underway at the Baltic Power offshore wind farm site in the Polish sector of the Baltic Sea, with several vessels involved, including Van Oord’s heavy-lift ship Svanen , in advance of the upcoming monopile installation work.

Van Oord’s heavy-lift vessel Svanen is currently situated at the Baltic Power site, some 23 kilometres off the Polish coast, according to the latest AIS data. The ship arrived at the Gdynia Port in November 2024.

Svanen , which underwent a gantry upgrade last year, will be responsible for the installation of the monopiles.

The offshore wind farm will consist of 78 monopiles in total – 76 for Vestas’ 15 MW wind turbines and two for offshore substations. Steelwind Nordenham is responsible for the delivery of monopiles, while Belgium-based Smulders will supply the transition pieces.

The monopiles will be up to 100 metres long, with a diameter of approximately 9 metres, and a weight of up to 1,700 tonnes.

YOU MIGHT ALSO LIKE

Recently, the developers behind the Polish project launched a scheme to compensate local shipowners for the restrictions on their fishing activities that result from the construction of the 1.2 GW wind farm.

Scheduled to commence operations in late 2026, the Baltic Power offshore wind farm is expected to deliver renewable energy to over 1.5 million Polish households.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Fixed-BottomProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago