The installation will be handled by the Polish firm Enprom, which will build cable lines on the land section for both Bałtyk 2 and Bałtyk 3.
Enprom will be the main contractor for four 220 kV cable tracks with a length of approximately seven kilometres and two 400 kV tracks leading to the PSE station located over six kilometres away.

