The two topsides are expected to be ready for sail-out by September 2025 for installation in the Polish sector of the Baltic Sea.
Located 23 kilometres off the coast of the Choczewo municipality, the 1,140 MW Baltic Power offshore wind is developed by a joint venture between Orlen Group and Northland Power.

