offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business development›ZF Wind Power Fires Up Powertrain Test Rig for 30 MW Turbines
ZF Wind Power 30 MW test rig

Share this article

ZF Wind Power has commissioned what the company claims to be the world’s most powerful validation test rig, which is capable of testing machines up to 30 MW.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business developmentR&DResearch & DevelopmentTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

18 days ago

The 30 MW test rig, which is now ready for operation at ZF Wind Power’s Test and Prototype Center in Lommel, Belgium, can validate complete powertrain systems for both onshore and offshore wind turbine applications.

With a length of 30 metres, the rig tests the dynamic behaviour of the main bearings, the gearbox, and the generator on the system level under real conditions with functional load tests, dynamics, and robustness tests.

It covers a maximum torque of 45 MNm, a maximum bending moment of 64 MNm, and a maximum axial force of 7,500 kN.

“Testing allows us to contain the risks inherent to the wind industry and it is essential to receive approval from customers, insurers, and certification agencies to launch new designs. To extend our portfolio, we started installing the world’s largest test rig in 2023. Now, in 2025, we are proud to announce the test rig is up and running and ready to develop the next generation powertrains,” said Bert Verdyck , head of Product Portfolio Management of ZF Wind Power.

The 30 MW test rig is an integral part of ZF Wind Power ’s Test and Prototype Center, located at the Belgian headquarters, according to the company.

This centre features multiple test rigs for components, assembly, sub-assembly, climate testing, load or no-load testing, and more. Additionally, an upcoming lubrication test rig will further enhance the company’s capabilities, said ZF Wind Power.

Follow offshoreWIND.biz on:

Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

18 days ago

Business development

May 1, 2025 · about 1 year ago

ZF Wind Power Fires Up Powertrain Test Rig for 30 MW Turbines

ZF Wind Power has commissioned what the company claims to be the world’s most powerful validation test rig, which is capable of testing machines up to 30 MW. The 30 MW test rig, which is now ready for operation at ZF Wind Power’s Test and Prototype Center in Lommel, Belgium, can validate complete po

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team