offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Equinor Resumes Empire Wind 1 Construction as US Gov’t Lifts Stop-Work Order
Authorities

May 20, 2025 · about 1 year ago

Equinor Resumes Empire Wind 1 Construction as US Gov’t Lifts Stop-Work Order

The US Department of the Interior’s Bureau of Ocean Energy Management (BOEM) has notified Equinor that the stop-work order for the Empire Wind 1 offshore wind project, issued on 16 April, has been lifted. Equinor said on 19 May that the company will now resume construction work on what will be the f

1 minutes read
  • LinkedIn
  • X
  • Email
Equinor Resumes Empire Wind 1 Construction as US Gov’t Lifts Stop-Work Order

Equinor’s CEO also thanked New York City Mayor Adams, congressional leaders, labour groups and other advocates who have maintained their support for the project, as well as the Norwegian Prime Minister Støre for the support and the Minister of Finance Stoltenberg for raising the issue with the US administration.

The developer, which recently said the Empire Wind 1 was at risk of missing this year’s offshore construction window due to the stop-work order and was considering cancelling the project as one of the options, now aims to carry out the planned activities during this offshore installation window and for the project to reach its planned commercial operation date in 2027.

Related Article

Equinor May Ditch Empire Wind 1 ‘in Coming Days’ Unless Stop-Work Order Lifted – Reports

The company also said on 19 May that it would engage with suppliers and regulatory bodies to reduce the impact of the stop-work order, and that it would perform an updated assessment of the project economics in the second quarter of this year.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesBusiness & FinanceFixed-BottomPlanning & PermittingProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago