offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Fixed-Bottom›ZTT’s Zhongtian 39 Completes Piling Work at 204 MW Chinese Offshore Wind Expansion Project
Fixed-Bottom

May 26, 2025 · about 1 year ago

ZTT’s Zhongtian 39 Completes Piling Work at 204 MW Chinese Offshore Wind Expansion Project

ZTT’s flagship monopile installation vessel Zhongtian 39 has completed the foundation piling for China Resources Power’s Cangnan No.1 Phase II offshore wind farm expansion project. The 215-metre-long Zhongtian 39 has installed all 13 foundation piles for the 204 MW Cangnan No.1 Phase II offshore win

1 minutes read
  • LinkedIn
  • X
  • Email
ZTT’s Zhongtian 39 Completes Piling Work at 204 MW Chinese Offshore Wind Expansion Project

The Cangnan No.1 Phase II offshore wind farm expansion project is located in the eastern sea area of Cangnan County, Zhejiang Province.

The project features 24 8.5 MW wind turbines with a total capacity of 204 MW.

When it comes to ZTT, the company recently won a contract for another Chinese offshore wind farm. Last month, ZTT Submarine Cable & System was awarded an engineering, procurement, and construction contract for the 1 GW project, owned by China’s CGN Wind Energy Limited.

Related Article

ZTT Wins Submarine Cable Contract for 1 GW Chinese Offshore Wind Farm

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Fixed-BottomProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago