Hollandse Kust Noord is located 18.5 kilometres off the coast of Egmond aan Zee and has 69 Siemens Gamesa SG 11.0-200 DD wind turbines.
The 759 MW offshore wind farm, which went into operation on 20 December 2023 , is expected to produce at least 3.3 TWh of electricity, which corresponds to 2.8 per cent of the electricity demand.

