The construction of the high-voltage alternating current (HVAC) infrastructure has begun with a first steel cut ceremony at the HSM Offshore Energy yard in Schiedam, the Netherlands. The HVAC modules will be directly installed on the Princess Elisabeth offshore energy hub (MOG2) in Belgium.
The HVAC substations will house essential components such as power transformers and gas-insulated switchgear (GS). The modules are being built by HSI Pemac, a Belgian-Dutch consortium comprising HSM Offshore Energy, Smulders, and Iv.

