offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Featured›First US WTIV Arrives in Virginia Ahead of CVOW Turbine Installation
Featured

September 18, 2025 · about 10 months ago

First US WTIV Arrives in Virginia Ahead of CVOW Turbine Installation

Charybdis, the first Jones Act-compliant offshore wind turbine installation vessel (WTIV), has arrived at Portsmouth Port ahead of its work at the 2.6 GW Coastal Virginia Offshore Wind (CVOW) project in the US. The vessel, built in the US, sailed into Portsmouth Port on 17 September, according to th

2 minutes read
  • LinkedIn
  • X
  • Email
sea trials wind turbine installation vessel

Share this article

Charybdis, the first Jones Act-compliant offshore wind turbine installation vessel (WTIV), has arrived at Portsmouth Port ahead of its work at the 2.6 GW Coastal Virginia Offshore Wind (CVOW) project in the US.

The vessel, built in the US, sailed into Portsmouth Port on 17 September, according to the ship’s AIS data available online.

With a length of 472 feet (approx. 144 metres), a width of 184 feet (about 56 metres), and a depth of 38 feet (approx. 12 metres), it is equipped with a 426-foot (about 130 metres) crane capable of lifting up to 2,200 tonnes, and an accommodation capacity of up to 119 people.

The WTIV, which underwent sea trials earlier this year, is designed to handle current and next-generation wind turbines of 12 MW or larger.

Related Article

Sea Trials Underway for First Jones Act-Compliant Wind Turbine Installation Vessel

Commissioned by Dominion Energy, the vessel will start work at the CVOW project site this month, with the installation of turbines in the western third of the lease area.

Located 43 kilometres off the coast of Virginia Beach, CVOW, the largest offshore wind project under construction in the US, will feature 176 Siemens Gamesa 14 MW turbines that will generate enough renewable energy to power up to 660,000 homes, according to the developer.

Related Article

DEME Installs First Coastal Virginia Offshore Substation in US

Reach the offshore wind industry in one go! offshoreWIND.biz is read by thousands of offshore wind professionals every day.

—

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our offshore wind business directory.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

FeaturedHeadlinesVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago