offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Featured›Iberdrola Launches Site Assessment Campaign at 3 GW Offshore Wind Project in Australia
Featured

September 23, 2025 · about 10 months ago

Iberdrola Launches Site Assessment Campaign at 3 GW Offshore Wind Project in Australia

Iberdrola has launched floating LiDAR and metocean measuring equipment at its Aurora Green offshore wind project site, located within the Gippsland offshore wind area in Australia. The equipment will collect data on wind, waves, currents, and other atmospheric and oceanographic parameters for 12-24

1 minutes read
  • LinkedIn
  • X
  • Email
Aurora Iberdrola Australia

Share this article

Iberdrola has launched floating LiDAR and metocean measuring equipment at its Aurora Green offshore wind project site, located within the Gippsland offshore wind area in Australia.

The equipment will collect data on wind, waves, currents, and other atmospheric and oceanographic parameters for 12-24 months.

The measurement campaign will inform project development and design, allowing Iberdrola to better characterise the wind resource of the feasibility licence area.

In July, Australia’s Offshore Infrastructure Regulator (OIR) approved the feasibility management plan for the offshore wind project, allowing the developer to commence metocean studies.

The site covers 700 square kilometres and is located about 25 kilometres offshore between Seaspray and Woodside Beach.

The up to 3 GW project is being developed in Gippsland, Australia’s first declared offshore wind zone .

Related Article

Iberdrola Cleared to Start Feasibility Activities Offshore Australia

The Victorian government recently postponed its first offshore wind auction , which was originally planned to be launched this month. However, Energy Minister Lily D’Ambrosio said that the government will provide an update on the option timeline by the end of this year.

Reach the offshore wind industry in one go!

offshoreWIND.biz is read by thousands of offshore wind professionals every day.

—

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our offshore wind business directory.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

FeaturedHeadlinesProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago