offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Featured›Vard Starts Building Industry’s ‘First’ Energy Construction Vessel
Featured

October 8, 2025 · about 9 months ago

Vard Starts Building Industry’s ‘First’ Energy Construction Vessel

Vard has cut the first steel for Norwind Offshore’s energy construction vessel (ECV), the first vessel of this category, according to the two companies. A steel-cutting ceremony was held on 6 October at Vard Vung Tau shipyard in Vietnam, kicking off the construction of the vessel, which Norwind Offs

2 minutes read
  • LinkedIn
  • X
  • Email
Vard Starts Building Industry’s ‘First’ Energy Construction Vessel

Share this article

Vard has cut the first steel for Norwind Offshore’s energy construction vessel (ECV), the first vessel of this category, according to the two companies.

A steel-cutting ceremony was held on 6 October at Vard Vung Tau shipyard in Vietnam, kicking off the construction of the vessel, which Norwind Offshore ordered last year.

Related Article

Norwind Offshore, Vard to Build First ‘Energy Construction Vessel’

Vard says the ECV is designed to play a pivotal role in the construction and maintenance of offshore wind farms.

According to Vard and Norwind Offshore, this is a whole new vessel category, developed jointly by the two companies. The vessel is of VARD 3 11 design, which the company says is tailor-made for the offshore wind and subsea market, including inspection, maintenance and repair of pipes, and construction and installation of infrastructure above and below sea level.

This is the first construction vessel Vard will build with a permanently installed motion-compensated gangway for walk-to-work operations. A walk-to-work electrically controlled motion compensated (ECMC) gangway with integrated 3D compensated crane functionality will be installed. To expand capacities, especially towards the growing renewables market, a movement-compensated offshore crane of 150 tonnes is also being installed, according to the vessel designer.

The first ECV will be built, outfitted, commissioned and delivered from Vard Vung Tau shipyard, with the delivery scheduled for the second quarter of 2027.

Reach the offshore wind industry in one go!

offshoreWIND.biz is read by thousands of offshore wind professionals every day.

—

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our offshore wind business directory.

Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

FeaturedHeadlinesVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago