offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Featured›RWE, Masdar’s Dogger Bank South Eastern Array Geotechnical Surveys Done
Featured

November 24, 2025 · about 8 months ago

RWE, Masdar’s Dogger Bank South Eastern Array Geotechnical Surveys Done

Fugro has completed the geotechnical site investigations for the eastern array of the Dogger Bank South (DBS) offshore wind farms in the UK. Geo-data specialist Fugro deployed five vessels to collect core samples and CPT data from up to 50 metres beneath the seafloor. By analysing these samples, the

1 minutes read
  • LinkedIn
  • X
  • Email
Dogger Bank South Fugro eastern array

Share this article

Fugro has completed the geotechnical site investigations for the eastern array of the Dogger Bank South (DBS) offshore wind farms in the UK.

Geo-data specialist Fugro deployed five vessels to collect core samples and CPT data from up to 50 metres beneath the seafloor.

By analysing these samples, the engineers gain insights that are key to designing foundations precisely tailored to the conditions at each turbine and platform location.

According to RWE, one of the developers of the project, the company had now moved to laboratory testing and the reporting phase to process the data ahead of making design decisions.

Earlier this year, Fugro signed a new contract with DBS developers RWE and Masdar for a detailed geotechnical survey of the eastern array of the proposed Dogger Bank South.

With an estimated combined installed capacity of 3 GW, the Dogger Bank South wind farms are planned to be built over 100 kilometres off the northeastern coast of England.

In July, the UK’s Planning Inspectorate completed its six-month Nationally Significant Infrastructure Project (NSIP) examination period for DBS offshore wind farms.

Related Article

Fugro Completes First Phase of Detailed Geotechnical Surveys at Dogger Bank South East

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

FeaturedHeadlinesProject UpdatesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago