Share this article
Cadeler’s new wind turbine installation vessel (WTIV), Wind Ace , has been launched at the COSCO Qidong yard.

Share this article
Cadeler’s new wind turbine installation vessel (WTIV), Wind Ace , has been launched at the COSCO Qidong yard.
offshoreWIND.biz is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Follow offshoreWIND.biz on:
Join thousands of industry professionals who start their day with our newsletter.
The hull was fully erected and completed inside the dry dock in just four months, the company said via social media .
With the launch complete, Wind Ace moves to the installation of the remaining leg sections, the main crane, and the start of commissioning activities.
Wind Ace , the second of Cadeler’s three A-class vessels currently under construction at COSCO, is scheduled for delivery in the second half of next year, when it will become the 11th vessel in the company’s fleet of wind turbine installation vessels.
The keel-laying ceremony for Wind Ace was held in September, the same month the first of the A-class vessels, Wind Ally , was delivered after completing sea trials .
China’s COSCO Heavy Industries is also building Cadeler’s third A-class vessel, Wind Apex , which will be delivered in 2027.
The A-class vessels will be able to transport and install seven complete 15 MW turbine sets per load or six sets of XXL monopile foundations.
Follow offshoreWIND.biz on:
11 days ago
about 7 months ago
Cadeler’s new wind turbine installation vessel (WTIV), Wind Ace, has been launched at the COSCO Qidong yard. The hull was fully erected and completed inside the dry dock in just four months, the company said via social media. With the launch complete, Wind Ace moves to the installation of the remain