offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Featured›Boslan to Supervise Component Manufacturing and Assembly for East Anglia Two
Boslan to Supervise Component Manufacturing and Assembly for East Anglia Two

Share this article

ScottishPower Renewables has selected Boslan, an Accenture company, to supervise the manufacturing and quality control of key components for the East Anglia Two offshore wind farm, including offshore and onshore substations, the platform’s foundations, inter-array cables, export cables, wind turbines and other mechanical equipment.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

FeaturedHeadlinesFixed-BottomManufacturingProject UpdatesSupply ChainWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

The offshore and onshore services Boslan will deliver for the 960 MW project include inspections of all factories where key components are produced and quality management for components, as well as supervision of quality assurance for pre-assembly.

The company will also provide supervision of inspection services for onshore and offshore logistics, and coordination of offshore construction and installation activities.

Offshore construction on East Anglia Two will start in 2027.

Located in the southern region of the North Sea, off the east coast of England, the 960 MW offshore wind farm was selected in the UK government’s Contract for Difference (CfD) Allocation Round 6 (AR6).

East Anglia Two will feature 64 Siemens Gamesa SG 14-236 DD wind turbines , which will be placed on top of the monopiles supplied by Sif. The installation of the wind turbines and foundations will be carried out by Cadeler .

Related Article

Sif, Smulders to Deliver Monopiles and TPs for ScottishPower’s East Anglia Two Offshore Wind Farm

“East Anglia TWO is a significant and complex project, so it’s great to be able to leverage the synergies offered by BOSLAN as a single supplier to ensure quality and timely delivery” , said Michael Hotze , East Anglia TWO Execution Director.

Reach the offshore wind industry in one go!

offshoreWIND.biz is read by thousands of offshore wind professionals every day.

—

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our offshore wind business directory.

Follow offshoreWIND.biz on:

Featured

January 20, 2026 · about 6 months ago

Boslan to Supervise Component Manufacturing and Assembly for East Anglia Two

ScottishPower Renewables has selected Boslan, an Accenture company, to supervise the manufacturing and quality control of key components for the East Anglia Two offshore wind farm, including offshore and onshore substations, the platform’s foundations, inter-array cables, export cables, wind turbine

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team