Share this article
The 95th and final wind turbine has been installed at the 1.2 GW Dogger Bank A offshore wind farm, the first phase of the 3.6 GW Dogger Bank Wind Farm in the UK. The wind turbine installation vessel (WTIV) Voltaire, which carried out the installation on Dogger Bank A, is now on its way to do the same work on Dogger Bank B.
