The contract for the Zeevonk project covers the design, engineering, manufacturing, testing and supply of around 162 kilometres of 66 kV inter-array cables, including associated accessories and project management services. The cables will be manufactured at TKF’s facility in Eemshaven.
The agreement includes the use of lower-emission and recycled materials, including low-emission aluminium, recycled steel and recycled copper, alongside a bitumen-free cable design aimed at reducing the environmental footprint of the project.
