offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Fixed-Bottom›RWE, TotalEnergies Charter Purus CSOV for Dutch Offshore Wind Farm
Fixed-Bottom

June 8, 2026 · about 1 month ago

RWE, TotalEnergies Charter Purus CSOV for Dutch Offshore Wind Farm

OranjeWind, the joint venture between RWE and TotalEnergies, has signed a five-year charter agreement with Purus for the deployment of the construction service operation vessel (CSOV) Purus Power at the OranjeWind offshore wind farm in the Netherlands. Under the agreement, which includes an extensio

1 minutes read
  • LinkedIn
  • X
  • Email
RWE, TotalEnergies Charter Purus CSOV for Dutch Offshore Wind Farm

OranjeWind, the joint venture between RWE and TotalEnergies, has signed a five-year charter agreement with Purus for the deployment of the construction service operation vessel (CSOV) Purus Power at the OranjeWind offshore wind farm in the Netherlands.

Under the agreement, which includes an extension option, the vessel will support both planned and unplanned operations and maintenance (O&M) activities at the offshore wind farm.

The 88-metre-long and 19-metre-wide Purus Power was purpose-built for offshore wind operations and is equipped with a diesel-electric and battery-hybrid propulsion system. The vessel is also prepared for future upgrades and potential conversion to zero-emission energy sources.

According to the project partners, the CSOV, which is fitted with an integrated walk-to-work system, is designed for extended offshore stays and includes accommodation, office space, meeting rooms, a gym and a mess area for personnel.

The OranjeWind offshore wind farm, also known as Hollandse Kust West VII, is being developed around 53 kilometres off the Dutch coast, where construction work has already started.

The 795 MW offshore wind farm will comprise 53 Vestas V236-15 MW wind turbines, installed on monopile foundations produced by Sif, and connected by inter-array cables supplied by TKF. The foundations and wind turbines will be installed by Jan De Nul, while the inter-array cable installation will be performed by DEME.

The OranjeWind offshore wind farm is scheduled to become operational in 2028.

Follow offshoreWIND.biz on:

Related Articles

Fixed-Bottom

Seabed Preparation Starts Ahead of Construction of New Dutch Offshore Wind Farm

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Fixed-BottomOperations & MaintenanceProject UpdatesSupply ChainVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago