A2SEA’s newly build Sea Installer calls into the Port of Esbjerg around the 6 December. Around New Year the ship will be sailing with two 6MW Siemens test mills to be installed at Gunfleet Sands.
Hereafter the Sea Installer will work at the Anholt project where A2SEA then will have four vessels working with installation. The powerful crane of the Sea Installer can lift 800 tons and the vessel can carry between eight and ten windmills at a time.