offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Swan Hunter Completes Norther Export Cable Work
Ports & Logistics

March 5, 2019 · about 7 years ago

Swan Hunter Completes Norther Export Cable Work

Swan Hunter has executed the final work scope of the Norther offshore wind farm export cable storage project at the storage and spooling yard in Vlissingen, the Netherlands. The last sections of spare array and export cables were transpooled from the Van Oord CLV Nexus, and the DOC-Swan Hunter 4750T

1 minutes read
  • LinkedIn
  • X
  • Email

Swan Hunter has executed the final work scope of the Norther offshore wind farm export cable storage project at the storage and spooling yard in Vlissingen, the Netherlands.

The last sections of spare array and export cables were transpooled from the Van Oord CLV Nexus, and the DOC-Swan Hunter 4750Te onshore basket carousel, to long term modular storage baskets.

The completion of this final spooling operation marks the end of a year-long contract for Van Oord, which included export cable load-in from HLV Da Ji, interim storage and protection, export cable load-out to CLV Nexus, spare cable transpooling and handling operations, and finally transportation of the loaded baskets to the long term storage site in Belgium.

“The successful completion of this project for Van Oord further exhibits our Storage and Spooling Yard as an attractive and strategic choice for installation contractors in the offshore wind industry,” Swan Hunter’s Director, Gerard Kroese , said.

”With a busy yard schedule ahead for Q2 2019, the combination of our dedicated cable handling equipment and strategically placed ‘direct to sea’ yard, proves the attraction of our full service solution to the offshore wind industry supply chain.”

The 370MW Norther offshore wind farm is currently being built in the Belgian North Sea some 23 kilometers from the port of Zeebrugge.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago