offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Photo of the Day: Maasvlakte Getting Ready for Haliade-X 12MW
Ports & Logistics

April 12, 2019 · about 7 years ago

Photo of the Day: Maasvlakte Getting Ready for Haliade-X 12MW

GE Renewable Energy is currently preparing the site in Maasvlakte, the Netherlands, for installation of its Haliade-X 12MW wind turbine prototype. Preparations of the site which will host the world’s most powerful offshore wind turbine are being carried out in partnership with Future Wind. The two c

1 minutes read
  • LinkedIn
  • X
  • Email

GE Renewable Energy is currently preparing the site in Maasvlakte, the Netherlands, for installation of its Haliade-X 12MW wind turbine prototype.

Preparations of the site which will host the world’s most powerful offshore wind turbine are being carried out in partnership with Future Wind.

The two companies signed an agreement at the beginning of the year under which the first Haliade-X 12 MW wind turbine prototype is to be installed in Maasvlakte-Rotterdam this summer, with five years of testing and a 15-year full-service O&M agreement.

The prototype, set to be installed onshore to facilitate access for testing, will allow the collection of data during the initial period of operations which is needed to obtain the Type Certificate in 2020 and ship the first commercial units in 2021.

Haliade-X 12 MW is currently being assembled at GE’s factory in Saint-Nazaire, France, with three LM Wind Power-designed 107m blades being manufactured in Cherbourg, France, and tower sections in Seville, Spain.

First activities on the ground started earlier this year with the construction of the Haliade-X 12MW foundation, which will contain 50 piles that will be covered by a 28m long foundation plate.

Foundation preparation will continue until the arrival of the nacelle, blades and tower prototype parts later in the summer.

All components will be shipped to Rotterdam, where pre-assembly work and installation will take place.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago