offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Able UK Plans to Build Offshore Wind Hub on Teesside
Ports & Logistics

June 3, 2019 · about 7 years ago

Able UK Plans to Build Offshore Wind Hub on Teesside

Billingham-based Able UK has revealed plans to develop a major offshore wind hub at South Bank, South Tees Area, Redcar to support the assembly, installation, and servicing of the offshore wind power sector. Able UK has engaged Prism Planning to prepare a planning application submission for the prop

1 minutes read
  • LinkedIn
  • X
  • Email

Billingham-based Able UK has revealed plans to develop a major offshore wind hub at South Bank, South Tees Area, Redcar to support the assembly, installation, and servicing of the offshore wind power sector.

Able UK has engaged Prism Planning to prepare a planning application submission for the proposed development.

Prism Planning has submitted an application for a scoping opinion to the Redcar & Cleveland Borough Council for the proposed development which forms part of the former Redcar Steelworks site and extends to an area of approximately 72 hectares.

Given the location of the North Sea offshore wind farms, the application site provides an optimal location for a number of offshore projects, Prism Planning said. The use of the port will include heavy load operations and handling of the various elements that comprise an offshore wind turbine.

The proposed development essentially has four parts to it: the construction of new quays; dredging of the River Tees to provide a berthing pocket, deep enough approach channel and turning area; the setting out of the operational area; and, the operation of the site.

The development will provide facilities which will be primarily used for the installation of foundations and topsides for offshore wind turbines. Suitable office and welfare accommodation will be provided for up to 600 workers and management, the scoping request detail said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago