offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›MHI Vestas Picks Port for Arcadis Ost 1 Turbine Pre-Assembly
Ports & Logistics

January 8, 2020 · about 6 years ago

MHI Vestas Picks Port for Arcadis Ost 1 Turbine Pre-Assembly

MHI Vestas has selected the Port of Roenne in Denmark for pre-assembly and shipment of turbine components for the Arcadis Ost 1 offshore wind project in Germany. MHI Vestas will provide 27 V174-9.5MW turbines for the Arcadis Ost 1 wind farm located off the coast of the Rugen island. The turbine inst

1 minutes read
  • LinkedIn
  • X
  • Email
MHI-Vestas-Picks-Port-for-Arcadis-Ost-1-Turbine-Pre-Assembly

MHI Vestas has selected the Port of Roenne in Denmark for pre-assembly and shipment of turbine components for the Arcadis Ost 1 offshore wind project in Germany.

MHI Vestas will provide 27 V174-9.5MW turbines for the Arcadis Ost 1 wind farm located off the coast of the Rugen island.

The turbine installation is set to take place in early June 2022 by a new method based on using a floating installation vessel to assemble the turbine components, which will be located onboard the deck, as well as a dummy tower.

“ Port of Roenne has been a solid choice because of its unique infrastructure, designed and constructed specifically to handle projects with extreme weights ,” said Peter Toft Madsen , Head of Port Contracting & Support at MHI Vestas Offshore Wind.

“The harbour is located only 74 kilometers from the Arcadis Ost 1 project site, and the quay construction at the port has the ideal lifting capacity for our needs, meaning we can ship our components directly to the quay.”

The 257MW Arcadis Ost 1 offshore wind farm is expected to be commissioned in 2023.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Abu Dhabi Ports, Dajin Heavy Industry Ink Offshore Wind MoU
Business & Finance

Abu Dhabi Ports, Dajin Heavy Industry Ink Offshore Wind MoU

about 1 month ago

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Abu Dhabi Ports, Dajin Heavy Industry Ink Offshore Wind MoU
Business & Finance

Abu Dhabi Ports, Dajin Heavy Industry Ink Offshore Wind MoU

about 1 month ago
Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago