offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Ørsted Setting Up Shop in Port Esbjerg
Ports & Logistics

March 5, 2020 · about 6 years ago

Ørsted Setting Up Shop in Port Esbjerg

Ørsted is building a new 3,000m2 central warehouse at a disused DFDS terminal in Port Esbjerg, Denmark. Slated for completion this summer, the facility will be used for main components for the wind turbine industry, such as gearboxes, generators, and transformers. ”We need more space for our operati

1 minutes read
  • LinkedIn
  • X
  • Email
Ørsted Setting Up Shop in Port Esbjerg

Ørsted is building a new 3,000m2 central warehouse at a disused DFDS terminal in Port Esbjerg, Denmark.

Slated for completion this summer, the facility will be used for main components for the wind turbine industry, such as gearboxes, generators, and transformers.

”We need more space for our operations going forward, and Port Esbjerg was an obvious choice for us,” said Troels Klit Pedersen , Head of Operations Supply Chain at Ørsted, said.

”There’s lots of room and we’ll be in an area where we’ll not need special transport permits to go through the city. In addition, there are excellent opportunities to extend in the future.”

In addition to space, the port of Esbjerg also has the necessary quay facilities that Ørsted needs, the port said.

The fact that many jack-up vessels are based at the port of Esbjerg will be an advantage to Ørsted, when the heavy components are to be shipped and installed.

‟We need the jack-up vessels to install the components, and many of them sail directly out of the port of Esbjerg. This means that we can load the goods directly onto the vessels from the central warehouse,” said Pedersen.

The new warehouse will have two indoor gantry cranes with a lifting capacity of up to 40 tonnes each. Envia Ejendomme has been tasked with building the new central warehouse for Ørsted.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago