offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›New Offshore Wind Wharf at Taichung Port Ready for Business
Ports & Logistics

June 15, 2020 · about 6 years ago

New Offshore Wind Wharf at Taichung Port Ready for Business

The Port of Taichung in Taiwan has completed the first of several tailor-made wharves that will be used for the offshore wind industry. Wharf No. 106, completed in mid-April, will soon be put into service receiving wind turbine parts and materials and shipping out assembled turbine components for in

1 minutes read
  • LinkedIn
  • X
  • Email
New Offshore Wind Wharf at Taichung Port Ready for Business

The Port of Taichung in Taiwan has completed the first of several tailor-made wharves that will be used for the offshore wind industry.

Wharf No. 106, completed in mid-April, will soon be put into service receiving wind turbine parts and materials and shipping out assembled turbine components for installation.

The vacant land behind the wharf is planned to be paved over for use as a multipurpose yard and bulk-cargo handling facility.

According to Port of Taichung, the new wharf provides a total waterline length of 450m, operating water depth of -16.3m, and a load-bearing structural width of 33m.

To meet the needs of jack-up vessels, the seabed in an area extending 200m beyond both ends of the wharf and 60m outward from the baseline has been reinforced to permit turbine installation vessel anchor loading operations up to 90mt/m2, the port said.

Wharves No. 2, 5A, 5B and 36 are also at various stages of construction or renovation and will support the turbine manufacturing, storage, assembly, and transport needs of private-sector contractors.

At the beginning of the year, Port of Taichung and Ørsted signed a wharf lease for the construction of the Greater Changhua offshore wind farms, as well as for project operations and maintenance.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago