offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Huisman’s New Muscle Performs First Offshore Wind Lift (Video)
Ports & Logistics

September 4, 2020 · about 5 years ago

Huisman’s New Muscle Performs First Offshore Wind Lift (Video)

Huisman’s 2,600mt Skyhook crane has performed its first lift of offshore wind monopiles at a facility in China. Skyhook was dedicatedly designed for load-outs of heavy equipment, like the 10,000mt tub mounted cranes for Heerema’s Sleipnir and the 3,000mt offshore mast crane for Boskalis, Huisman sai

1 minutes read
  • LinkedIn
  • X
  • Email
Huisman's New Muscle Performs First Offshore Wind Lift (Video)

Huisman’s 2,600mt Skyhook crane has performed its first lift of offshore wind monopiles at a facility in China.

Skyhook was dedicatedly designed for load-outs of heavy equipment, like the 10,000mt tub mounted cranes for Heerema’s Sleipnir and the 3,000mt offshore mast crane for Boskalis, Huisman said.

The crane is located at its own facility near Xiamen.

“With the high ambitions for offshore wind in various parts of the world, we see that more permanent yet more flexible lifting solutions are key to further efficiency gains in the logistics chain,” said Cees van Veluw , Product Manager Cranes at Huisman.

“The capacity of the Skyhook matches the foundation sizes we see in the near future, while the Dual Main Hoist gives large advantages to easier connection and handling of loads. With new marshalling ports being developed worldwide, we see that the Skyhook can contribute to further optimising the logistics of offshore wind turbines and foundations.”

Skyhook has a lifting height with Super Flyjib of 170m above the waterline. It features a fully electrically driven system, dual main hoist and boom stowage functionality, while versions with SWL up to 5,000mt are available upon request, Huisman stated.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago