offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›GE Readies First 40 Nacelles for Saint-Nazaire OWF
Wind Farm Update

April 21, 2021 · about 5 years ago

GE Readies First 40 Nacelles for Saint-Nazaire OWF

The first 40 Haliade 150-6MW nacelles for the Saint-Nazaire offshore wind farm have exited GE Renewable Energy’s factory in Saint-Nazaire, France. GE dispatched the first nacelle for the project from its factory in Montoir-de-Bretagne in February, when it was transported to the wind turbine pre-asse

1 minutes read
  • LinkedIn
  • X
  • Email
GE Readies First 40 Nacelles for Saint-Nazaire OWF

The first 40 Haliade 150-6MW nacelles for the Saint-Nazaire offshore wind farm have exited GE Renewable Energy’s factory in Saint-Nazaire, France.

GE dispatched the first nacelle for the project from its factory in Montoir-de-Bretagne in February, when it was transported to the wind turbine pre-assembly site in the Port of Saint-Nazaire.

The company rolled out the first offshore wind turbine nacelle for the 480 MW offshore wind farm at its factory in September 2020. The factory is now being expanded to accommodate the production of nacelles for GE’s new Haliade-X turbines.

The Saint-Nazaire project will comprise 80 Haliade 150-6 MW turbines, installed between 12 and 20 kilometres off the coast of the Guérande peninsula.

The offshore wind farm, also known as Parc du Banc de Guérande, is scheduled to be operational in 2022, when it will become the first commercial-scale wind farm built in French waters.

The wind farm is being developed by Eolien Maritime France (EMF), a consortium of EDF Renouvelables, Enbridge, and Canada Pension Plan Investment Board.

Related Articles

Wind Farm Update

First GE Haliade 6 MW Nacelle Arrives at Saint-Nazaire OWF Pre-Assembly Site

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

23 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

23 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago