offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Siemens Gamesa Assembles First Offshore Wind Turbine Nacelle Outside Europe
Ports & Logistics

August 3, 2021 · about 5 years ago

Siemens Gamesa Assembles First Offshore Wind Turbine Nacelle Outside Europe

Siemens Gamesa’s offshore wind nacelle assembly facility in Taichung, Taiwan has assembled its first nacelle. This marks the first time a Siemens Gamesa offshore turbine nacelle has been assembled outside Europe. The construction work on Siemens Gamesa’s assembly facility in Taichung Harbor started

1 minutes read
  • LinkedIn
  • X
  • Email
Siemens Gamesa Assembles First Offshore Wind Turbine Nacelle Outside Europe

Siemens Gamesa’s offshore wind nacelle assembly facility in Taichung, Taiwan has assembled its first nacelle.

This marks the first time a Siemens Gamesa offshore turbine nacelle has been assembled outside Europe.

The construction work on Siemens Gamesa’s assembly facility in Taichung Harbor started in March 2020.

The parcel of land being developed in Taiwan measures over 30,000 square metres and will support Ørsted’s 900 MW Greater Changhua 1 & 2a project, where SG 8.0-167 DD turbines will be used, Siemens Gamesa said.

The Greater Changhua 1 & 2a wind farm will comprise 111 SG 8.0-167 DD wind turbines installed on jacket foundations in the Taiwan Strait, some 35 to 50 kilometres off the coast of Changhua County.

Related Article

Action Heats Up at Changhua 1 and 2a Wind Farm Offshore Taiwan

The offshore construction at the Greater Changhua 1 and 2a sites will be carried out during 2021 and 2022, with the project expected to be fully up and running in 2022.

The wind turbine installation is slated for 2022.

Related Articles

Ports & Logistics

Siemens Gamesa Breaks Ground on Taiwanese Nacelle Assembly Facility

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says
Energy Islands

Offshore Wind Could Help Create ‘Electric Shipping Highway’ Across Europe, Study Says

about 1 month ago
Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged
Business & Finance

Brave Tern Detained After Collision with Another WTIV in Port; Several Thor Wind Turbine Blades Damaged

about 1 month ago