A collaboration between SSE Renewables, Sif Group, Cambridge Vacuum Engineering (CVE), and TWI, has resulted in the first-ever electron beam welded section to be incorporated in an offshore wind turbine monopile foundation.
The resulting can was incorporated into a monopile transition piece in January 2023 and is scheduled to be installed offshore as part of a foundation in the second phase of Dogger Bank Wind Farm, located more than 130 kilometres off the Northeast coast of England, in late 2023.

