offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

All

Loading filters...
NewsAuthoritiesBusiness & FinanceOperations & MaintenanceR&D
Protean Energy to Install Its First Wave Energy Conversion Platform North of Geraldton (Australia)
News

Protean Energy to Install Its First Wave Energy Conversion Platform North of Geraldton (Australia)

WAVE energy projects are gaining a groundswell of interest, with locally designed technology starting to deliver stable power to the grid. By Rebecca Le May (smh) [mappress] Source: smh, August 12, 2011

about 15 years ago
Unclearity of Government’s Regulation and Legislation Holds Back Green Energy Projects (UK)
Authorities

Unclearity of Government’s Regulation and Legislation Holds Back Green Energy Projects (UK)

MAJOR green energy projects in Yorkshire and across the UK have been held back by a lack of clarity and consistency from the Government… (yorkshirepost) [mappress] Source: yorkshirepost, August 12, 2011

about 15 years ago
Proteus NP1000 Gets Government Approval for Deployment off Humber Coast (UK)
News

Proteus NP1000 Gets Government Approval for Deployment off Humber Coast (UK)

The Government has given its approval to deploy a pioneering generator which will harness the power of the Humber estuary to produce… By Alexandra Wood (yorkshirepost) [mappress] Source: yorkshirepost, August 12, 2011

about 15 years ago
REpower Announces 1st Quarter 2011/12 Results with EUR 4.2m Net Earnings (Germany)
Business & Finance

REpower Announces 1st Quarter 2011/12 Results with EUR 4.2m Net Earnings (Germany)

The REpower Systems Group (WKN 617703) increased its sales by approx. 23% to EUR 262.5 million (previous year: EUR 213.1 million) in the first quarter of the 2011/12 fiscal year (April 1 to June 30, 2011). Total performance grew by nearly 22% from EUR 204.0 million to EUR 248.3 million. EBIT was EUR

about 15 years ago
Offshore Wind Could Provide 30 pct of Michigan’s Electrical Energy Needs, Says MacInnes (USA)
News

Offshore Wind Could Provide 30 pct of Michigan’s Electrical Energy Needs, Says MacInnes (USA)

Making a dedicated commitment to the environment is not a simple or inexpensive undertaking for any business. By Laura Young (mlive) [mappress] Source: mlive, August 12, 2011

about 15 years ago
STX Turku Begins Construction of NB 1379 Multipurpose Deck Cargo Vessel (Finland)
News

STX Turku Begins Construction of NB 1379 Multipurpose Deck Cargo Vessel (Finland)

STX Finland’s Turku Shipyard started the production of the innovative and versatile multipurpose deck cargo vessel ordered by Oy Gaiamare… (cruiseindustrynews) [mappress] Source: cruiseindustrynews, August 11, 2011

about 15 years ago
Europe Lags Behind its Renewable Targets
News

Europe Lags Behind its Renewable Targets

With nightly riots in London, financial uncertainty spreading across Europe and concerns over home-grown terrorism in Scandinavia, the issue… By Katherine Tweed (greentechmedia) [mappress] Source: greentechmedia, August 12, 2011

about 15 years ago
First Minister Backs Offshore Wind Farm Development (Scotland)
Authorities

First Minister Backs Offshore Wind Farm Development (Scotland)

First Minister Alex Salmond was in Fraserburgh to discuss plans for an offshore windfarm which is helping Scotland meet its renewable… (stv) [mappress] Source: stv, August 12, 2011

about 15 years ago
Germany and the Netherlands Argue Over Placing of Wind Turbines off Schiermonnikoog Island
Authorities

Germany and the Netherlands Argue Over Placing of Wind Turbines off Schiermonnikoog Island

The Netherlands and Germany are embroiled in a dispute over the placing of wind turbines at sea off the coast of the Dutch island of… (dutchnews) [mappress] Source: dutchnews, August 11, 2011

about 15 years ago
OMM to Open New Office in Germany
News

OMM to Open New Office in Germany

UK based Offshore Marine Management (OMM) is significantly expanding its business in the German sector via the establishment of its first Operational Support Base at Cuxport. OMM’s German subsidiary; Offshore Marine Services GmbH (OMS) is also investing in its headquarters in the City of Bremen by r

about 15 years ago
Seajacks Vessels Install 36 Turbines at Walney 2 Offshore Wind Farm (UK)
Operations & Maintenance

Seajacks Vessels Install 36 Turbines at Walney 2 Offshore Wind Farm (UK)

The Seajacks vessels continue to work in tandem, installing Siemens 3.6MW WTGs at a rapid pace on Walney 2 Offshore Wind Farm. Recent installation activities have been described as “booming” by client Dong Energy. 155 turbines now installed – 7 turbines installed in the past week Seajacks Operations

about 15 years ago
Wind Turbines to Have no Effect on WW1 Sub Wrecks (UK)
News

Wind Turbines to Have no Effect on WW1 Sub Wrecks (UK)

OF THE nine million people killed in the First World War​, few could have died in more unusual or tragic circumstances than those lost in the Battle of May Island​. Two hundred and seventy lives were claimed as two submarines sank and three other vessels were damaged on the night of January 31-Febru

about 15 years ago
EMU Limited Bags Prestigious Seabed Survey Contract (UK)
R&D

EMU Limited Bags Prestigious Seabed Survey Contract (UK)

The Maritime and Coastguard Agency (MCA) has awarded marine survey specialists EMU Limited (EMU) a multi-million pound hydrographic contract as part of its programme to systematically survey the waters around the UK. Using the latest dual-head high-resolution multibeamechosounders to obtain seabed d

about 15 years ago
Sheringham Shoal Offshore Wind Farm Faces Delays (UK)
News

Sheringham Shoal Offshore Wind Farm Faces Delays (UK)

Scira partners Statoil and Statkraft insist the 317MW Sheringham Shoal offshore wind farm is on budget despite a revised construction schedule that now targets commercial operation in summer 2012. That is some six months later than originally planned. The ballpark cost of the troubled project remain

about 15 years ago
  • 1
  • …
  • 2672
  • 2673
  • 2674
  • …
  • 2945