offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
AuthoritiesContracts & TendersWind Farm UpdatePorts & LogisticsTechnologyBusiness & FinanceVesselsEnvironmentR&DGrid ConnectionJobs & Recruitment
An offshore wind farm
Authorities

France Pinpoints New 1 GW Offshore Wind Area, Kicks Off Tendering Process

French government has selected an area off Cotentin as the place where its eighth offshore wind farm will be built, and launched a competitive tender process with a plan to select a developer in 2022. French Ecological Transition Minister Barbara Pompili and Minister of the Sea Annick Girardin annou

about 5 years ago
MHI Vestas Rolls Out 500th V164 Nacelle
Ports & Logistics

MHI Vestas Rolls Out 500th V164 Nacelle at Lindø

MHI Vestas Offshore Wind has assembled and rolled out the 500th V164 nacelle from the Lindø facility in Denmark. The 500th nacelle is among those being shipped to the UK for installation in 2021, the turbine maker said. MHI Vestas’ Lindø factory has been producing V164 nacelles since 2014, and curre

about 5 years ago
ESB Issues Technical Due Diligence and Consultancy Call
Contracts & Tenders

ESB Issues Technical Due Diligence and Consultancy Call

Ireland’s Electricity Supply Board (ESB) has issued a tender for technical due diligence services and energy consultancy services for offshore wind, as well as solar and onshore wind projects. The services will be for various projects which are at different stages of development, for future generati

about 5 years ago
A GE Haliade X wind turbine, similar to what will be used on Dogger Bank A & B
Business & Finance

Italian Oil & Gas Major Buys Into World’s Largest Offshore Wind Farm

Eni has entered into agreements with Equinor and SSE Renewables to acquire 10 per cent stake in Dogger Bank A and B from each, which will lead to a shareholding setup of SSE and Equinor each owning 40 per cent and Eni holding 20 per cent in the first two phases of what will become […]

about 5 years ago
First Monopile Stands at Yunlin Offshore Wind Farm
Wind Farm Update

First Monopile Stands at Yunlin Offshore Wind Farm

Sapura Energy Berhad has installed the first of the 80 monopiles at the 640 MW Yunlin wind farm offshore Taiwan. The installation of the first monopile marks the official start of the project’s offshore construction phase. The contract to transport and install the wind turbine foundations at Yunlin

about 5 years ago
Construction of Les Alizés Begins
Vessels

Construction of Les Alizés Begins

Jan De Nul and China Merchant Heavy Industry (CMHI) have begun the construction of the 5,000-tonne floating installation crane vessel Les Alizés. Les Alizés is specifically designed for loading, transporting, lifting, and installing offshore wind turbine foundations. It will be capable of building t

about 5 years ago
An offshore wind farm
Authorities

UK: Crown Estate Commits to Net Zero by 2030

The UK Crown Estate has set a target to become a net zero carbon business by 2030 and outlined its commitments to reach this goal, which include optimising the green energy potential of the UK’s offshore renewable energy resources. The move has come as the Crown Estate wants to align with the 1.5°C

about 5 years ago
Ørsted Sells 25 Per Cent Stake in Ocean Wind to PSEG
Business & Finance

Ørsted Sells 25 Per Cent Stake in Ocean Wind to PSEG

Ørsted has entered into an agreement to sell a 25 per cent ownership interest in its 1,100 MW Ocean Wind offshore wind project to New Jersey’s Public Service Enterprise Group (PSEG). PSEG’s contribution will include both a conventional and tax equity investment in the project. The partners did not d

about 5 years ago
LEAPWind
R&D

EU-Funded Project Solving Blade Erosion Problem

The EU-funded project LEAPWind, which has been working on preventing blade erosion on offshore wind turbines, has put its solution(s) to test on an existing wind turbine in Portugal. LEAPWind said it was using a new commercial leading-edge blade component with new thermoplastic materials and innovat

about 5 years ago
Kriegers Flak Site Boulder-Free
Wind Farm Update

Kriegers Flak Site Boulder-Free

Asso.subsea has completed the boulder removal campaign for the Kriegers Flak offshore wind project in the Danish Baltic Sea. ASSO was responsible for the boulder clearance of 68 turbine installation locations for jacking operations and all related MBES & SSS surveys, approximately 3500 targets in to

about 5 years ago
Triton Knoll and Moray East OFTO Licence Auction Round Opens
Contracts & Tenders

Triton Knoll and Moray East OFTO Licence Auction Round Opens

UK energy market regulator Ofgem has opened a tender round to grant two offshore transmission licences to connect the Moray East and the Triton Knoll offshore wind farms to the UK grid. The tender process will consist of two stages for each project, an Enhanced Pre-Qualification (EPQ) stage, and an

about 5 years ago
The trencher during Prysmian's test campaign at the Saint-Brieuc offshore wind farm
Wind Farm Update

All Saint-Brieuc Inter-Array Cables to Be Buried

Ailes Marines reported on 2 December that all the inter-array cables at the Saint-Brieuc offshore wind farm will be buried to minimise the interference for navigation and fishing activities. According to the developer, due to extreme site conditions a commitment to bury half of the cables was made i

about 5 years ago
US Wind Appoints Former Deepwater Wind Head as CEO
Business & Finance

US Wind Appoints Former Deepwater Wind Head as CEO

US Wind has named Jeff Grybowski as CEO to lead the company in developing its MarWin offshore wind project off the coast of Maryland. Grybowski is the former CEO of Deepwater Wind, and under his leadership the company developed Block Island – the first offshore wind farm in the U.S. “I’m thrilled to

about 5 years ago
TenneT Issues Call for BorWin6 Converter Platforms
Contracts & Tenders

TenneT Issues Call for BorWin6 Platforms

TenneT TSO GmbH has issued a tender notice for the design, manufacture, installation, and commissioning of the BorWin6 converter platforms. Located in the North Sea Cluster 7, the 900 MW BorWin6 is scheduled to be commissioned by 2027. The offshore grid connection will collect the three-phase electr

about 5 years ago
  • 1
  • …
  • 672
  • 673
  • 674
  • …
  • 2945