offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

All

Loading filters...
Contracts & TendersWind Farm UpdateVesselsNewsR&DTechnologyEnvironmentBusiness & Finance
Siemens Gamesa Turbines for German Offshore Wind Farm
Contracts & Tenders

Siemens Gamesa Turbines for German Offshore Wind Farm

Siemens Gamesa has received a firm order to deliver its SG 8.0-167 DD Flex wind turbines for innogy’s 342 MW Kaskasi offshore wind farm in the German North Sea. In total, Siemens Gamesa will manufacture and deliver 38 wind turbines for the project. The order also comes with a two-year service and ma

about 6 years ago
Bakker Sliedrecht Wins Bokalift 2 Contract
Vessels

Bakker Sliedrecht Wins Bokalift 2 Contract

Bakker Sliedrecht has secured a contract to renew, modify, extend and integrate all electrotechnical installations of Boskalis’ new crane vessel Bokalift 2. Bakker Sliedrecht is responsible for the engineering, production, supply, installation, testing and commissioning of all electrical systems and

about 6 years ago
Photo of DEME's vessel Orion with the lifted crane
Vessels

Photo of the Day: Orion Reaches for the Sky

The crane boom on the offshore installation vessel Orion has been lifted to its full height for the first time, DEME Group reported via social media on 2 April.

about 6 years ago
Highlights of the Month – March 2020
News

Highlights of the Month – March 2020

We bring you the ten most-read articles on OffshoreWIND.biz for the month of March 2020. Siemens Gamesa 11MW Turbine Prototype Goes Full Tilt Siemens Gamesa’s prototype SG 11.0-193 DD Flex wind turbine has produced 11MW of power, the turbine maker said. ABB Tech for Japanese Wind Turbine Installatio

about 6 years ago
Nexans Aurora Taking Final Shape
Vessels

Nexans Aurora Taking Final Shape

The construction of the cable laying vessel (CLV) Nexans Aurora is “well on track and proceeding”, Nexans reported. According to the cable manufacturer, the vessel’s blocks will soon be completely assembled. Nexans Aurora is a DP3 cable laying vessel that will be outfitted for power cable laying, in

about 6 years ago
Photo showing offshore wind turbines in operation
Contracts & Tenders

BSH Moves Geological Modelling Tender Dates

Germany’s Federal Maritime and Hydrographic Agency (BSH) has pushed back the deadlines for the tender for geological modeling and reporting on wind areas in the North and Baltic Seas.

about 6 years ago
Innogy Enters Taiwanese Offshore Wind Market
Wind Farm Update

Innogy Enters Taiwanese Offshore Wind Market

Essen-based energy company innogy has entered into a strategic partnership with Asia Cement Corporation to jointly develop the 448 MW Chu Feng offshore wind project in Taiwan. The Chu Feng offshore wind farm is located off the northwest coast of Taiwan near Hsinchu City, in the wind-rich Taiwan Stra

about 6 years ago
Photo of Helios Remote Sensing System at sea, awarded DOE's funding in 2017
R&D

US DOE Issues USD 20 Million Offshore Wind Call

The U.S. Department of Energy (DOE) has called for applications for funding that will support offshore wind technology demonstration and wind resource characterisation projects. For this call, DOE has designated a total of USD 20 million.

about 6 years ago
Triton Knoll Starts Marine Mammals Safety Mission
Environment

Triton Knoll Starts Marine Mammals Safety Mission

Seiche Environmental has been appointed to monitor and manage the safety of marine mammals at the Triton Knoll offshore wind project site in the UK. Seiche Environmental stated it is in charge of implementing important mitigation measures at the site offshore Lincolnshire, despite it already being a

about 6 years ago
Fugro Preps Houston Lab for More Offshore Wind Work
Technology

Fugro Preps Houston Lab for More Offshore Wind Work

Fugro has recently doubled the advanced soil testing capacity for three-way bender element triaxial and cyclic simple shear testing at its Houston geotechnical laboratory to meet the growing demand from offshore wind projects in the US. Three-way bender element testing is performed on triaxial tests

about 6 years ago
Photo showing first blades for the Beatrice offshore wind farm lined up at Siemens Gamesa Hull site.
Business & Finance

Siemens Gamesa Restarts Production at Hull Factory

Siemens Gamesa has resumed production at its blade factory in Hull today (1 April), after pausing operations on 24 March.

about 6 years ago
Fabrication Production for Changhua Phase 1 Nears Completion
Wind Farm Update

Foundation Production for Changhua Phase 1 Nears Completion

The fabrication of foundations for Taiwan Power Company‘s Changhua Phase 1 offshore wind project has neared completion, Jan De Nul reported. The project will feature 21 5.2MW turbines located off the coast of Fangyuan in Central Western Taiwan. The jackets are being manufactured at the South Korean

about 6 years ago
Deutsche Bank Closes Hedge for Taiwanese Offshore Wind Farm
Business & Finance

Deutsche Bank Closes Hedge for Taiwanese Offshore Wind Farm

Deutsche Bank has closed a deal contingent interest rate swap on TWD 90 billion (around EUR 2.7 billion) project finance for the development of the 589 MW Changfang and Xidao wind farm off Changhua County, Taiwan. The investment consortium, led by Copenhagen Infrastructure Partners (CIP) through its

about 6 years ago
Image showing wind production statistics in a graph
Wind Farm Update

Winter Brings Good Tidings to Belgian Offshore Wind

This winter, offshore wind energy covered some 9 percent of the total electricity demand in Belgium, which represents a 50 per cent increase over the annual average in 2019.

about 6 years ago
  • 1
  • …
  • 783
  • 784
  • 785
  • …
  • 2945