
Adira Renewables, the wholly-owned subsidiary of Singapore’s offshore services provider Kim Heng and Soiltech Engineering Co Ltd Korea (STE), has launched a geotechnical survey vessel, rebuilt/converted in 2024, into the water. Kim Heng announced today, 15 April, the completion of the christening ce

Discover how Davi’s technology is helping the construction of wind energy foundations and towers, enhancing precision, efficiency, and reliability in the industry. Global expansion of wind energy and Davi’s roleThe wind energy sector is witnessing growth on a global scale. According to BloombergNEF,

Despite uncertainty about US markets, one thing is for sure: Norwegian companies still believe in both short-term and long-term opportunities in US offshore wind. Norwegian offshore wind suppliers, including Autronica, DOF and Uptime International, are forging ahead with plans to expand their activi

Fugro and Spoor have signed a memorandum of understanding (MoU) to develop a new AI bird-monitoring solution for offshore wind projects. The solution uses video cameras installed on Fugro’s SEAWATCH wind LiDAR and other metocean buoys to record bird activity at offshore wind farm locations. Spoor’s

Louis Dreyfus Armateurs (LDA) has received an Approval in Principle (AiP) from Bureau Veritas for its full liquid hydrogen-based service operation vessel (SOV). The liquid-hydrogen SOV is said to be able to operate 95 per cent of the time with zero carbon emissions, with the vessel only releasing wa

EOLOS has been awarded four lots within the offshore wind zones selected by the Portuguese Government National Laboratory of Energy and Geology (LNEG) for measuring the wind and metocean site conditions. Under the contract, EOLOS will be responsible for the supply, installation, and operation of flo

The ELWIND project has launched a tender seeking a contractor to carry out in-situ metocean measurement campaigns for offshore wind farms at Estonia and Latvia sites. According to ELWIND, the campaign must be done by a single provider for the two offshore wind farm sites of the ELWIND project. The s

The wind energy sector is experiencing unprecedented growth, necessitating advancements in the manufacturing of wind towers and their foundations. Manufacturers face challenges such as accommodating larger turbine sizes, enhancing structural integrity, and improving production efficiency. Faccin, a

A geophysical survey is scheduled to commence this month at the site in Scotland where ScottishPower Renewables plans to build its 2 GW MachairWind offshore wind project. The geophysical survey will be carried out by Sulmara from the Port of Larne with an earliest commencement date of 15 April, acco

TotalEnergies and European Energy have signed a joint declaration to pursue opportunities within offshore wind in Denmark and explore further cooperation on onshore renewables and low-carbon molecule projects. The joint declaration was signed during the State Visit to France in the presence of Denma

We are glad to unveil our partnership with GS Entec for the supply of two huge plate rolling machines (equipped with all the accessories that are needed), marking a new chapter in offshore wind power structures. Introducing GS Entec: a leader in offshore wind powerGS Entec has established itself as

On 13 March, the state-owned Philippine National Oil Company (PNOC) signed a memorandum of understanding (MoU) with the Batangas provincial government to explore the development of an offshore wind integration port in the province. Under the agreement, PNOC will take the lead in conducting explorato

The French Directorate General for Energy and Climate (DGEC) has launched a consultation on proposals for the country’s tenth offshore wind call for tenders (AO10), which is expected to award around 9 GW of capacity. A call for tenders is set to be launched in the upcoming months, aimed at awarding

Two applications have been submitted to build an offshore wind farm on the Saare 7 site in Estonia, with the auction for the area scheduled for June 2025. OÜ Utilitas Wind and Sunly Wind OÜ each filed their own competing application for the Saare 7 area, which covers approximately 158.9 square kilom