US offshore wind developer Deepwater Wind has adopted a procedure designed to prevent impacts to commercial fishing gear from offshore wind energy activities.
The technical staff of Ohio Power Siting Board (OPSB) has published its Report of Investigation, recommending that the Board approves the construction of the proposed Icebreaker offshore wind farm in Lake Erie, subject to certain conditions.
APEM has commenced aerial wildlife surveys at Ørsted’s 573MW Race Bank wind farm located offshore North Norfolk in the UK.
The Massachusetts Environmental Policy Act Office (MEPA) has requested a supplemental filing to the Draft Environmental Impact Report (DEIR) for the Vineyard Wind Connector project.
Natural Resources Wales (NRW) has selected ABPmer to provide guidance on marine and coastal physical processes Environmental Impact Assessment (EIA) baseline survey and post-consent monitoring requirements for major marine development projects relevant to Welsh waters.
The European Commission, the European Parliament and the European Council have made a political agreement on a binding renewable energy target for the EU for 2030 of 32%.
Rotterdam-based Amphibious Energy is testing the Hybrid EnergyPod, a container designed to generate, store and convert solar and wind power, at the Port of Rotterdam’s Maasvlakte 2.
Scottish government has published a draft Climate Change Bill that will immediately set a target of a 90% reduction in greenhouse gas emissions by 2050 and guide to the government’s aim of making Scotland one of the first countries to achieve a 100% reduction (net-zero) as soon as possible.
New Jersey’s Governor Phil Murphy has signed the A-3723 – the Renewable Energy bill which codifies the goal of 3,500 MW of offshore wind by 2030 and reinstates an expired program to provide tax credits for offshore wind manufacturing activities.
The US Bureau of Ocean Energy Management (BOEM) has extended the comment period for information and industry interest in offshore wind energy development within the New York Bight region.
Arcadis and Pondera Consult will carry out a strategic study into the various possibilities to transport the energy from future large-scale offshore wind farms in the Dutch North Sea to the national grid.
MHI Vestas Offshore Wind has confirmed that its 9MW turbine platform will be typhoon ready in 2020, in time for all offshore wind projects in Taiwan.
Norwegian oil and gas major Aker BP has tabled a proposal to power the NOAKA project on the Norwegian Continental Shelf with electricity from shore combined with offshore wind.
US offshore wind developer Vineyard Wind has submitted a Draft Environmental Impact Report (DEIR) with state regulators for its proposed 800MW wind farm off Massachusetts.