offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Featured

Loading filters...
HeadlinesAuthoritiesFixed-BottomFloating WindPlanning & PermittingBusiness & FinancePorts & LogisticsGrid ConnectionOffshore PlatformsProject UpdatesWind Farm UpdateContracts & TendersSupply ChainFoundationsCablesCollaborationOutlook & StrategyVessels
More Than GBP 1 Billion Up for Grabs in UK’s AR7 for Offshore Wind
Featured

More Than GBP 1 Billion Up for Grabs in UK’s AR7 for Offshore Wind

The UK government has set a total budget of GBP 1.08 billion (approximately EUR 1.24 billion) for offshore wind and floating wind in the Contracts for Difference (CfD) Allocation Round 7 (AR7) renewables auction. A total of GBP 900 million has been set for fixed-bottom projects in Pot 3, with delive

about 9 months ago
Siemens Gamesa 236 DD
Featured

Siemens Gamesa Shelves Esbjerg Offshore Wind Turbine Nacelle Factory

The Spanish-German engineering company Siemens Gamesa has decided to shelve plans for an offshore wind turbine nacelle factory at the Port of Esbjerg in Denmark. Siemens Gamesa told offshoreWIND.biz that the Port of Esbjerg remains a key hub for its offshore wind activities and that the company cont

about 9 months ago
Petrofac Files for Administration After Lost TenneT Contracts
Featured

Petrofac Files for Administration After Lost TenneT Contracts

Following the termination of Petrofac’s scope of work on the 2 GW offshore grid connection programme in the Netherlands by the Dutch TSO TenneT, the UK engineering and consultancy provider has filed for administration. In an update on 27 October, Petrofac said the Directors of Petrofac Limited, the

about 9 months ago
First High-Voltage Transformer Installed on Baltica 2 Offshore Substation
Featured

First High-Voltage Transformer Installed on Baltica 2 Offshore Substation

The first high-voltage transformer has been placed on one of four offshore substations that will be installed at the Baltica 2 offshore wind project site in the Polish Baltic Sea. The substations will collect electricity from the 107 Siemens Gamesa 14 MW-222 turbines, stepping up the voltage, and tr

about 9 months ago
WindFloat Atlantic
Featured

ABL Companies Supporting Geoscience Work at Two Offshore Wind Areas in Portugal

The Portuguese Institute for Sea and Atmosphere (IPMA) has appointed the UK-based renewable energy consultancy OWC, part of ABL Group, to support the geophysical and geotechnical surveys at two offshore wind farm areas in Portugal. ABL Group’s Portugal-based water and environmental consultancy, Hidr

about 9 months ago
European Floating LiDAR, Energy Intelligence Providers Join Forces in Brazilian Offshore Wind Market
Featured

European Floating LiDAR, Energy Intelligence Providers Join Forces in Brazilian Offshore Wind Market

TGS, an energy data and intelligence provider based in Norway and the US, and EOLOS, a floating LiDAR technology provider based in Spain, have partnered to offer wind and metocean measurement campaigns in Brazil. Within the partnership, TGS will manage client contracts, campaign design, deployment a

about 9 months ago
Sleipnir to Install Sofia HVDC Offshore Substation
Featured

Sleipnir Installs East Anglia Three Offshore Substation Topside

The offshore substation topside for the East Anglia Three offshore wind farm has been installed, with commissioning work expected to start at the beginning of November. According to a weekly notice of operations issued by ScottishPower Renewables, which is building the 1.4 GW offshore wind farm, the

about 9 months ago
TenneT Seeks Certification for 2GW HVDC Platform
Featured

TenneT’s 2 GW Contract Termination Derails Petrofac’s Restructuring Plans

Petrofac’s planned financial restructuring can no longer proceed as originally intended following the termination of its scope of work by TenneT for an offshore wind project, the company announced on 23 October. Petrofac said that its board has determined that the restructuring, which had reached an

about 9 months ago
AFRY Nets Technical Consultancy Framework Agreement with Vattenfall
Featured

AFRY Nets Technical Consultancy Framework Agreement with Vattenfall

AFRY has secured a new framework agreement with Vattenfall, under which the engineering consultancy company will be delivering technical consultancy services to the renewable energy developer. The agreement entails AFRY providing services across multiple competence areas and regions within Vattenfal

about 9 months ago
Kajima Inks Foundation Contract for 315 MW Japanese Offshore Wind Farm
Featured

Kajima Inks Foundation Contract for 315 MW Japanese Offshore Wind Farm

Oga Katagami Akita Offshore Green Energy has signed a contract with Kajima Corporation for the manufacturing, procurement, transportation, and installation of turbine foundations for the company’s offshore wind project in Japan. The contract covers the core construction of the wind turbine foundatio

about 9 months ago
First Export Cable In at Inch Cape Offshore Wind Farm
Featured

First Export Cable In at Inch Cape Offshore Wind Farm

The first of the two 85-kilometre export cables for the Scottish Inch Cape offshore wind farm has been installed by Enshore Subsea using the cable laying vessel (CLV) CMOS Installer. Operating from the Port of Blyth, the vessel laid the 220 kV, three-phase cable manufactured by Ningbo Orient Wires &

about 9 months ago
Second Hornsea 3 Substation Topside En Route to Europe
Featured

Second Hornsea 3 Substation Topside En Route to Europe

Aibel has completed the second offshore converter station topside for the Hornsea 3 offshore wind project at its yard in Thailand. The substation, Hornsea 3 Link 2, has started its journey to Europe, according to a social media post Aibel shared on 22 October. Aibel and Hitachi Energy signed a contr

about 9 months ago
Turkish-Built, Methanol-Powered Subsea Vessel Faces Deferred Delivery
Featured

Turkish-Built, Methanol-Powered Subsea Vessel Faces Deferred Delivery

The delivery of a next-generation subsea vessel being built at the Turkish Sefine Shipyard for Norway’s Eidesvik Offshore and Agalas has been delayed for the third quarter of 2026, instead of the initial plan for early next year. The 100-metre-long Viking Vigor will be powered by methanol and, upon

about 9 months ago
USD 475 Million WTIV Dispute Pushes Seatrium, Maersk Offshore Wind to Arbitration Table
Featured

USD 475 Million WTIV Dispute Pushes Seatrium, Maersk Offshore Wind to Arbitration Table

Singapore’s Seatrium has received a notice of arbitration from Maersk Offshore Wind concerning the dispute over the termination of a contract for a wind turbine installation vessel (WTIV), planned to be deployed on Equinor’s Empire Wind offshore wind project in the US. Seatrium Energy International

about 9 months ago
  • 1
  • …
  • 31
  • 32
  • 33
  • …
  • 63