offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Fixed-Bottom

Loading filters...
FeaturedHeadlinesFoundationsManufacturingProject UpdatesSupply ChainWind Farm UpdateCablesGrid ConnectionOffshore PlatformsBusiness & FinancePower-to-XTransitionContracts & TendersAuthoritiesPlanning & PermittingFloating Wind
Dajin Starts Manufacturing Foundations for Polish Offshore Wind Farm
Fixed-Bottom

Dajin Starts Manufacturing Foundations for Polish Offshore Wind Farm

Dajin Heavy Industry has cut the first steel for the monopiles for the BC-Wind project, a 390 MW offshore wind farm that Ocean Winds is set to build in Poland. The company has been contracted to manufacture and deliver 27 monopiles and 27 transition pieces, with the delivery scheduled for 2026. For

about 7 months ago
All XXL Monopiles for Inch Cape Offshore Wind Farm Delivered
Fixed-Bottom

All XXL Monopiles for Inch Cape Offshore Wind Farm Delivered

China’s CNOOD-Wenchong Heavy Industries (CWHI) has shipped the final eight XXL monopiles for the Scottish Inch Cape offshore wind farm, completing the delivery of all 32 monopiles it was contracted to produce for the project. The last batch has departed CWHI’s Qinzhou yard aboard the COSCO Shipping

about 7 months ago
China’s Farthest Offshore Wind Farm at Full Power
Fixed-Bottom

China’s Farthest Offshore Wind Farm at Full Power

The Three Gorges Jiangsu Dafeng project, China’s farthest offshore wind farm, is now operating at full capacity, Chinese media reported on 15 December. The 800 MW offshore wind farm has been built in the northeastern sea area of Dafeng District, Yancheng City, and consists of four sites, with the fa

about 7 months ago
Jan De Nul, Hellenic Cables Link Nordseecluster A Offshore Wind Site to DolWin Kappa Platform
Fixed-Bottom

Jan De Nul, Hellenic Cables Link Nordseecluster A Offshore Wind Site to DolWin Kappa Platform

Jan De Nul has installed three HVAC subsea cables, delivered by Hellenic Cables, between TenneT’s offshore converter station DolWin kappa and Nordseecluster 1 and 2 sites in the German North Sea. The two locations make up the 660 MW Nordseecluster A offshore wind farm, which itself is part of a bigg

about 7 months ago
Dutch Gas Platform Now Powered by German Offshore Wind Farm
Fixed-Bottom

Dutch Gas Platform Now Powered by German Offshore Wind Farm

The Netherlands-based exploration and production player ONE-Dyas, together with its partners EBN and Tenaz Energy, has tucked a new decarbonisation milestone under its belt by breathing life into the first natural gas production platform in the Dutch and German sectors of the North Sea to run on off

about 7 months ago
GE Vernova-Seatrium Consortium to Build BalWin 5 Offshore Converter Platform
Fixed-Bottom

GE Vernova-Seatrium Consortium to Build BalWin 5 Offshore Converter Platform

The GE Vernova-Seatrium consortium has been awarded a contract to deliver the offshore converter platform for TenneT’s 2.2 GW BalWin5 offshore grid connection in the German North Sea. The contract is the fourth one awarded under the five-year framework agreement that GE Vernova and Seatrium signed w

about 7 months ago
JERA Nex BP’s Australian Offshore Wind Farm Awarded Major Project Status
Fixed-Bottom

JERA Nex BP’s Australian Offshore Wind Farm Awarded Major Project Status

The Blue Mackerel offshore wind project, being developed by JERA Nex BP (a 50:50 joint venture between JERA Co. and BP), has been awarded Major Project Status (MPS) by the Australian federal government. With the MPS recognition, the proposed 1 GW project secures dedicated support from the Federal Ma

about 7 months ago
DEME's vessel Orion installing a monopile at Moray West offshore site
Fixed-Bottom

DEME to Install Monopiles, Cables at Ocean Winds’ Offshore Wind Farm in Poland

Ocean Winds, a 50-50 joint venture between EDP Renewables and ENGIE, has contracted DEME for the installation of monopile foundations, inter-array cables, and the export cable at the BC-Wind offshore wind farm in Poland. While the value of the three contracts was not disclosed, DEME noted in a press

about 7 months ago
BRANDED CONTENT
Davi Completes FAT for Titan Wind Energy’s Four Heavy-Duty Plate Rolls, First Delivery Imminent
Fixed-Bottom

Davi Completes FAT for Titan Wind Energy’s Four Heavy-Duty Plate Rolls, First Delivery Imminent

Davi has reached another milestone in the project it’s carrying on with Titan Wind Energy, completing the Factory Acceptance Test (FAT) for four heavy-duty plate rolls designed for offshore wind tower and monopile manufacturing. The FAT took place in Week 46 at Davi’s headquarters in Cesena, Italy,

about 7 months ago
Contracts for Difference Bumped Up to EU Level as Commission Releases New Grids Package
Fixed-Bottom

Contracts for Difference Bumped Up to EU Level as Commission Releases New Grids Package

The European Commission just published a European Grids Package that includes Guidance on Contracts for Difference (CfDs), making the offshore wind industry’s much-sought-after procurement model soon to be mandated by the EU. While the new package has yet to be adopted and will serve as a foundation

about 7 months ago
Ocean Winds Adds ABL to BC-Wind Team
Fixed-Bottom

Ocean Winds Adds ABL to BC-Wind Team

Energy and marine consultancy ABL has been appointed to provide marine warranty survey (MWS) services to support Ocean Winds with the construction of Poland’s BC-Wind offshore wind farm. The BC-Wind offshore wind farm is to be constructed over an area of approximately 90 square kilometres, located w

about 7 months ago
Subsea7 Scores ”Sizeable” Offshore Wind Contract in Poland
Fixed-Bottom

Subsea7 Scores ”Sizeable” Offshore Wind Contract in Poland

Seaway7, part of the Subsea7 Group, has won what the group has described as ”a sizeable contract” by Ocean Winds for the BC-Wind offshore wind project in the Polish Baltic Sea. Located some 23 kilometres off the Polish coast, the 390 MW BC-Wind offshore wind farm will comprise 26 Siemens Gamesa wind

about 7 months ago
First Monopile In at ‘Most Ecological Offshore Wind Farm Yet’
Fixed-Bottom

First Monopile In at ‘Most Ecological Offshore Wind Farm Yet’

Van Oord, using its installation vessel Boreas, installed the first monopile at the Ecowende offshore wind farm on 3 December. The project, a joint venture between Shell, Eneco and Chubu Electric Power, is being built off the coast of the Netherlands and is said to become the most ecological offshor

about 7 months ago
Another Developer in Australia Drops Offshore Wind Project
Fixed-Bottom

Another Developer in Australia Drops Offshore Wind Project

A consortium led by AGL Energy has discontinued feasibility studies for the Gippsland Skies offshore wind project and will surrender its feasibility licence for the proposed 2.5 GW development off Victoria’s Gippsland coast, Australian media reports. The move makes this the third project in the Gipp

about 7 months ago
  • 1
  • …
  • 23
  • 24
  • 25
  • …
  • 115