Total quality assurance provider Intertek has been commissioned by the North Sea Wind Power Hub (NSWPH) programme to undertake a UK permitting and planning study. Consortium partners behind the NSWPH programme, TenneT Netherlands, TenneT Germany, Energinet, Gasunie, and Port of Rotterdam, have joine
Dutch transmission system operator TenneT inaugurated the 700MW Borssele Alpha offshore high voltage substation on Thursday, 5 September. The final piece for the completion of the Borssele Alpha project was the certification provided by DNV GL, TenneT said. The Borssele Alpha will collect the electr
DNV GL and TenneT have signed a four-year framework agreement covering project certification of new high-voltage direct current (HVDC) substations in the German North Sea. The transmission system operator awarded DNV GL the contract following an independent EU tendering process. The agreement includ
Ofgem has selected Transmission Capital Partners as the preferred bidder for the long-term license and operation of the transmission link connecting the 400MW Rampion offshore wind farm to the UK grid. Transmission Capital Partners is a consortium comprising International Public Partnerships Limited
The 700MW COBRA Cable interconnector linking the Dutch and the Danish grid will be available for the electricity market as of delivery day, 7 September, Dutch high-voltage grid operator TenneT said. The 325-kilometre subsea high-voltage direct current cable is an initiative of TenneT and the Danish
The 962-ton Northwester 2 offshore high voltage station has completed its journey from Aalborg, Denmark to the Port of Oostende in Belgium. The Port of Oostende will be a temporary home to the substation prior to the installation at the site some 48 kilometres north-west of Oostende. The substation’
The European Commission has approved, under the EU Merger Regulation, the acquisition of joint control over Diamond Transmission Partners Galloper (Holding) Limited by Diamond Transmission Corporation Limited (DTC) and InfraRed Capital Partners Limited (IRCP), all of the UK. Diamond Transmission Par
EDS HV Group has carried out a cable testing campaign for Vattenfall at the Horns Rev 1 offshore wind farm in Denmark after the project had experienced network issues. EDS used Damped AC testing (DAC) to collect partial discharge (PD) and tanδ data to interpret the condition of the inter-array cable
Siemens has won a contract to deliver two converter stations for the 1,400MW Viking Link interconnector, the first high-voltage direct-current (HVDC) link between Great Britain and Denmark. The interconnector is being jointly developed by National Grid Ventures, Great Britain, and Energinet, Denmark
The offshore substation built for the Northwester 2 offshore wind farm has left Bladt Industries’ facility in Aalborg, Denmark, and is on its way towards the project site in Belgium. Bladt designed, built and assembled the substation with its partners Semco Maritime and ISC under a contract won in M
NKT, Energinet, and National Grid have signed the final contract documents for the supply of onshore power cables for the 1,400MW Viking Link interconnector. Under the contract valued at around EUR 90 million, NKT will deliver approximately 150 kilometres of 525kV MI high-voltage DC onshore power ca
Bladt Industries has loaded out the offshore substation destined for the Northwester 2 offshore wind farm. According to Bladt, the substation will soon leave its facility in Aalborg, Denmark, for the project site in the Belgium part of the North Sea. The 235t transformer was installed on the offshor
The BorWin3 offshore wind grid connection in the German North Sea has started transmitting power. According to Petrofac, the 900MW project has begun converting three-phase electric power generated by offshore wind farms into direct current and transmitting it 160km back to shore into the German nati
The reduction in the energy supply from the Hornsea One offshore wind farm on 9 August was caused by a lightning strike, an initial report from National Grid Electricity System Operator (NGESO) has revealed. Following the lighting strike, Hornsea One immediately de-loaded from 799MW to 62MW, the rep