offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
FeaturedHeadlinesFixed-BottomOffshore PlatformsProject UpdatesWind Farm UpdateFloating WindOnshore InfrastructureRegional newsBusiness & FinanceBusiness developmentCablesInnovationOutlook & StrategyTechnologyTransitionVesselsContracts & TendersSupply ChainAuthoritiesPress releasesInfrastructurePlanning & Permitting
Taipower Taiwan
Grid Connection

Substation Stands at Taipower Offshore Wind Project Phase II

The offshore substation for the Taipower Offshore Wind Project Phase II (TPC Phase II) has been installed at the site in Taiwan. The topside, which left Vietnam in July, was placed on top of its jacket foundation by Shinfox Far East Energy’s SFE Hercules. The launching ceremony for the offshore subs

about 11 months ago
BuhaWind Philippines
Grid Connection

Philippines’ 2 GW Northern Luzon Floating Wind Project Presses Ahead

Buhawind Energy Northern Luzon Corporation has secured the facilities study (FS) approval from the National Grid Corporation of the Philippines (NGCP) for its 2 GW Northern Luzon floating offshore wind project. The study outlines the critical technical requirements necessary for the integration of t

about 11 months ago
Construction Starts on Chinese Pure-Electric Cable Laying Vessel
Grid Connection

China’s ZTT starts construction of advanced cable laying vessel

China’s ZTT Submarine Cable & System has begun construction of an advanced cable laying vessel (CLV) that will service offshore wind, island interconnections, and regional grid expansion projects in Asia Pacific (APAC). The new-generation, self-propelled CLV will be 139.8 meters long, with a 38-mete

about 11 months ago
Inch Cape substation installation
Grid Connection

Heerema’s Sleipnir Installs Offshore Substation at Inch Cape Wind Farm Site

The offshore jacket foundation and substation platform have been installed at the Inch Cape offshore wind farm site in the North Sea. The Siemens Energy Offshore Transformer Module (OTM) and its 68-metre jacket foundation are now in position 21 kilometres from the Angus coast, Scotland, having been

about 11 months ago
Inch Cape substation
Grid Connection

Inch Cape Substation En Route to Project Site Offshore Scotland

The substation platform and jacket foundation for the Inch Cape offshore wind farm have departed from the Smulders yard in Wallsend, Newcastle, and are en route to their site off the Angus coast in Scotland. The Siemens Energy Offshore Transformer Module (OTM) and its jacket foundation sailed at sun

about 1 year ago
ZTT Submarine Cable & System
Grid Connection

New 500 kV Submarine Cable Contract to Keep ZTT Busy Offshore China

ZTT Submarine Cable & System (ZTTSC) has secured a 500 kV submarine cable contract for Shenzhen Energy’s 500 MW Honghai Bay VI offshore wind project in China. The engineering, procurement, construction, and installation (EPCI) contract encompasses 94 kilometres of 500 kV 3-core HVAC submarine cables

about 1 year ago
Prysmian Contracts NextGeo to Survey Export Cable Routes for New Dutch Offshore Wind Farms
Grid Connection

Prysmian Contracts NextGeo to Survey Export Cable Routes for New Dutch Offshore Wind Farms

Prysmian has awarded two contracts to Next Geosolutions (NextGeo), one of which is in the Dutch offshore wind market, where NextGeo will carry out export cable route surveys for the IJmuiden Ver Alpha and Nederwiek 1 offshore wind sites. The second contract NextGeo secured with Prysmian is for the B

about 1 year ago
Asso.subsea TenneT
Grid Connection

TenneT Picks Asso.subsea for 2 GW Cable Installation Work in Germany

Asso.subsea has been awarded a nearshore cable installation contract for three projects under TenneT’s 2 GW programme in Germany. The projects are BalWin4, LanWin1, and LanWin5, located off the northwestern coast of Baltrum Island, in northern Germany. The contract marks the beginning of a new colla

about 1 year ago
Thor substation
Grid Connection

Substation Installed at Denmark’s Largest Offshore Wind Farm

The jacket foundation and the substation topside have been installed at the 1 GW Thor offshore wind farm site in Denmark. Following the jacket and topside’s sail-away from HSM Offshore Energy’s Schiedam yard in the Netherlands, the installation of the 2,600-tonne topside was executed offshore, with

about 1 year ago
BorWin epsilon platform
Grid Connection

TenneT to Soon Decide Whether to Launch IPO or Private Share Placement for German TSO; German Gov’t Still Considering Buy-In

TenneT Holding is exploring two options to meet TenneT Germany’s equity requirements: a private placement of shares and an initial public offering (IPO), and expects to decide on which option to proceed with in September. The German government has not yet excluded the possibility of buying into the

about 1 year ago
First US Subsea Rock Installation Vessel Launches, Delivery Early in 2026
Grid Connection

First US Subsea Rock Installation Vessel Launches, Delivery Early in 2026

Texas-headquartered Great Lakes Dredge & Dock Corporation (GLDD) has launched the first US-flagged, Jones Act-compliant subsea rock installation vessel (SRIV), with delivery expected early in 2026. Acadia, launched at the Hanwha Philly Shipyard, Pennsylvania, is capable of transporting and installin

about 1 year ago
Subsea Cable Connecting DolWin Epsilon Platform to Land Installed
Grid Connection

Subsea Cable Connecting DolWin Epsilon Platform to Land Installed

The laying of the subsea cable that connects the DolWin epsilon platform to land has been completed. The platform and the cables, part of TenneT’s DolWin5 grid connection, will transmit the electricity generated by Ørsted’s Borkum Riffgrund 3 offshore wind farm to the German grid on land. The DolWin

about 1 year ago
Cable Connection Needed for German Offshore Platform
Grid Connection

New York State Stops Offshore Wind Transmission Development Until ‘Federal Conditions Allow’

The New York State Public Service Commission (PSC) has decided to “strategically terminate” the Public Policy Transmission Need (PPTN) process for offshore wind transmission infrastructure. The PSC says this is due to the federal government halting new offshore wind permitting, and that cancelling t

about 1 year ago
Construction of 'Asia's Largest HVDC Cable Facility' Wraps Up
Grid Connection

Construction of ‘Asia’s Largest HVDC Cable Facility’ Wraps Up

South Korean subsea cable manufacturer LS Cable & System has completed the construction of what it says is the largest high-voltage direct current (HVDC) cable production facility in Asia. LS Cable & System announced on 16 July that it had completed the construction of its fifth submarine cable plan

about 1 year ago
  • 1
  • …
  • 13
  • 14
  • 15
  • …
  • 276