offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
VesselsContracts & TendersTechnologyWind Farm UpdateBusiness & FinanceR&DOperations & Maintenance
NKT Victoria Lays First Subsea Cables in Moray Firth
Grid Connection

NKT Victoria Lays First Subsea Cables in Moray Firth

The NKT Victoria cable-laying vessel has successfully laid the first HVDC cables in the Moray Firth as part of Scottish and Southern Electricity Networks’ GBP 1.1 billion Caithness-Moray transmission project.

about 9 years ago
Elia Issues UXO Call
Grid Connection

Elia Issues UXO Call

Belgian transmission system operator Elia has invited tenders for unexploded ordnance (UXO) survey, identification and removal on the cable route of the Modular Offshore Grid (MOG) project in the Belgian sector of the North Sea.

about 9 years ago
Atkins to Design Binhai South Phase 3 Offshore Substation
Grid Connection

Atkins to Design Binhai South Phase 3 Offshore Substation

Atkins has been appointed by PowerChina Huadong Engineering Co. Ltd (HDEC) to design the offshore substation platform at State Power Investment Corporation’s (SPIC) 300MW Binhai South Phase 3 offshore wind farm in the Yellow Sea

about 9 years ago
TenneT Issues EUR 1 Billion Green Bond
Grid Connection

TenneT Issues EUR 1 Billion Green Bond

Transmission system operator (TSO) TenneT Holding B.V. has launched and priced another Green Bond issue under its green bond program of EUR 1 billion.

about 9 years ago
Maersk Connector Grounds for Walney Extension (Video)
Grid Connection

Maersk Connector Grounds for Walney Extension (Video)

DeepOcean has performed the first engineered grounding of the Maersk Connector during export cable pull-in operations on DONG Energy’s 660MW Walney Extension offshore wind farm.

about 9 years ago
IRENA and State Grid of China to Cooperate on Energy Transition
Grid Connection

IRENA and State Grid of China to Cooperate on Energy Transition

The International Renewable Energy Agency (IRENA) and the State Grid Corporation of China (SGCC), the world’s largest utility, agreed to enhance their co-operation with a view to advancing the energy transition under global and regional initiatives, including the Paris Agreement and the Belt and Roa

about 9 years ago
Prysmian Puts Seamole ROV to Work
Grid Connection

Prysmian Puts Seamole ROV to Work

The Seamole (previously Excalibur), a recently upgraded remotely operated vehicle (ROV), has successfully completed its first round of projects burying offshore power cables for Prysmian Powerlink Services Ltd.

about 9 years ago
STX Unveils Scalable Offshore Substation
Grid Connection

STX Unveils Scalable Offshore Substation

STX France has launched the SeeOs – a Scalable Efficient Evolutive Offshore Station described as a turnkey solution to the offshore wind market that will reduce energy costs by decreasing delivery time and saving CAPEX and OPEX costs.

about 9 years ago
DONG to Keep Burbo Bank Grid Frequency Steady with Wind Power-Battery Hybrid
Grid Connection

DONG to Keep Burbo Bank Grid Frequency Steady with Wind Power-Battery Hybrid

DONG Energy has announced plans to offer frequency response from its existing Burbo Bank offshore wind farm using a combination of wind power and battery.

about 9 years ago
VBMS to Install Hornsea One Nearshore Export Cables
Grid Connection

VBMS to Install Hornsea One Nearshore Export Cables

VBMS, a subsidiary of Royal Boskalis Westminster, has been awarded a contract to assist DEME’s subsidiary Tideway with the installation of three nearshore and shallow water sections of export cables for DONG Energy’s 1.2GW Hornsea Project One offshore wind farm.

about 9 years ago
Wiking Choppers for DolWin Gamma
Grid Connection

Wiking Choppers for DolWin Gamma

Wiking Helikopter Service GmbH has won the contract to provide helicopter services to the installation site DolWin Gamma, an offshore converter station being installed by Nordic Yards GmbH 50 kilometres north of the island of Borkum.

about 9 years ago
Trelleborg Unveils NjordGuard Cable Protection System
Grid Connection

Trelleborg Unveils NjordGuard Cable Protection System

Trelleborg’s offshore operation will launch its recently qualified cable protection system, NjordGuard, at the Offshore Wind Energy 2017 exhibition in London.

about 9 years ago
JDR Wins WindFloat Atlantic Cable Order
Grid Connection

JDR Wins WindFloat Atlantic Cable Order

Hartlepool-based subsea cable supplier JDR has been selected by WindPlus as the preferred cable supplier for the 25MW Windfloat Atlantic floating wind farm

about 9 years ago
EIB and Stattnet Sign EUR 300 Million NordLink Financing Deal
Grid Connection

EIB and Stattnet Sign EUR 300 Million NordLink Financing Deal

The European Investment Bank (EIB) has signed a EUR 300 million loan agreement with Norwegian transmission system operator (TSO) Statnett for the completion of the NordLink interconnector between Germany and Norway.

about 9 years ago
  • 1
  • …
  • 152
  • 153
  • 154
  • …
  • 276