The cable laying vessel Stemat Spirit is being loaded with the first batch of inter-array cables for the Galloper offshore wind farm at JDR Cables’ facility in Hartlepool.
Lincolnshire design consultancy Land Drainage Services Ltd (LDS) has been awarded a contract extension by Triton Knoll Offshore Wind Farm to provide a long-term liaison service between the project and its local landowners.
Ecology specialists from Royal Haskoning DHV will for the next two weeks survey vegetation and wildlife habitats at parts of the onshore export cable corridor for the 900MW Triton Knoll offshore wind farm.
Representatives of Dutch, Danish and German transmission system operators will sign an agreement to develop the North Sea Wind Power Hub during the first meeting of the North Seas Energy Forum held in Brussels today.
Heerema Fabrication Group has moved the substation topside for the 336MW Galloper offshore wind farm out of the fabrication hall at the company’s Hartlepool yard.
Japanese offshore wind-power resources have been largely overlooked but have tremendous potential, and can viably contribute to baseload power demand in the country’s post-nuclear era, according to a report released by the Institute for Energy Economics and Financial Analysis (IEEFA).
Geoscience and engineering service provider Next Geosolutions has been awarded two survey contracts for the 1.4GW North Sea Link (NSL) project, the world’s longest subsea interconnector and the first electricity link between UK and Norway.
Danish subsea services provider JD-Contractor has signed a framework agreement with compatriot Energinet.dk for contingency repairs of the transmission system operator’s subsea cables.
Good Energy Group has signed an agreement with DONG Energy which will see the Chippenham-based renewable electricity supplier and generator source offshore wind power for its customers for the first time.
Danish transmission system operator Energinet.dk is looking for a provider of manned crew transfer vessels (CTVs) for the transportation of service crews between the harbors of Klintholm/Rødsand and the Kriegers Flak platforms KFA and KFB in the Baltic Sea.
Engineering consultancy WSP | Parsons Brinckerhoff has been appointed by National Grid North Sea Link Ltd to provide cable manufacturing quality and inspection services on the 1.4GW North Sea Link interconnector, the first electricity link between Nordic and British markets.
UK-based ecology consultancy Thomson Ecology has been contracted by DONG Energy to undertake the Phase 2 ecological surveys to inform the 2.4GW Hornsea Project Three offshore wind farm onshore cable route Environmental Statement.
80% of power generation and 65% of total primary energy supply should come from renewables if global energy-related carbon dioxide (CO2) emissions are to be reduced by 70% by 2050 and completely phased-out by 2060, according to new findings released by the International Renewable Energy Agency (IREN
The Engie Fabricom and Iemants consortium has shipped the first of two offshore substations built for DONG Energy’s 660MW Walney Extension offshore wind farm in the Irish Sea from the construction yard in Hoboken, Belgium.