offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Contracts & TendersTechnologyWind Farm UpdateEnvironmentR&DBusiness & FinanceOperations & MaintenanceVesselsAuthorities
Elia Seeks Offshore SwitchYard Installation Contractor
Grid Connection

Elia Seeks Offshore SwitchYard Installation Contractor

Elia Asset N.V., part of the Elia Group, has invited tenders for the installation of the Offshore SwitchYard (OSY) Platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea. The contract includes, but is not limited to, installation, engineering, providing cargo barge, transport

about 9 years ago
Nexans Nets EA1 Export Cable Contract, Hires DeepOcean for Installation
Grid Connection

Nexans Nets EA1 Export Cable Contract, Hires DeepOcean for Installation

Nexans has won a contract worth more that EUR 180 million for supply submarine cables that will carry the electricity from the 714MW East Anglia ONE offshore wind farm to the mainland.

about 9 years ago
Hornsea Three Consultation Events Back by Popular Demand
Grid Connection

Hornsea Three Consultation Events Back by Popular Demand

DONG Energy will be holding an additional round of consultation events in Norfolk in March 2017, in response to interest from the community on the proposed 2.4GW Hornsea Project Three offshore wind farm. Over 170 people attended the initial community consultation events in October and November last

about 9 years ago
Prysmian Picks Tekmar Cable Protection Systems for Rentel
Grid Connection

Prysmian Picks Tekmar Cable Protection Systems for Rentel

Cable protection systems (CPS) supplier Tekmar Energy has won a contract to supply Prysmian PowerLink with 84 of its TekLink CPS units for the 3o9MW Rentel offshore wind farm project in Belgium. The supply for the contract will be executed in Tekmar’s production facility in the North East of England

about 9 years ago
Top News of the Week, 09 – 15 January 2017
Grid Connection

Top News of the Week, 09 – 15 January 2017

Vattenfall Buys 584MW Offshore Wind Project in German North Sea Swedish utility Vattenfall has bought the 584MW Atlantis I offshore wind project in the German North Sea from PNE Wind AG. Sea Mine Found at Gode Wind 2 Goes Kaboom The sea mine which was found floating near the Gode Wind 2 wind farm si

about 9 years ago
Rampion Offshore Substation Jacket In Place
Grid Connection

Rampion Offshore Substation Jacket In Place

The offshore substation jacket for the 400MW Rampion offshore wind farm has been installed off the coast of Sussex, UK, Babcock International Group reports. Babcock’s two-year Rampion contract involves the engineering, procurement and onshore construction of the 400MW substation topside and jacket.

about 9 years ago
EnBW Nets Bard 1 Platform Service Contract
Grid Connection

EnBW Nets Bard 1 Platform Service Contract

EnBW has taken over the technical operations of the residential and transformer platform at the 400MW Bard Offshore 1 wind farm in the German North Sea. To this end EnBW Offshore Service GmbH (EOS) has signed a three-year service agreement with the operator and owner of Bard Offshore 1, Ocean Breeze

about 9 years ago
ABB Fixes DolWin2 Cable Ahead of Schedule
Grid Connection

ABB Fixes DolWin2 Cable Ahead of Schedule

The 916MW DolWin2 offshore grid connection has been re-energized much sooner than expected following cable repairs undertaken by ABB, TenneT TSO’s spokesperson confirmed to Offshore WIND. DolWin2 has been back in operation since Saturday, 7 January, the spokesperson said. ABB was initially expected

about 9 years ago
Siemens Direct Drive Offshore Wind Turbines Generate 2.5 TWh of Power
Grid Connection

Siemens Direct Drive Offshore Wind Turbines Generate 2.5 TWh of Power

Siemens’ direct drive offshore wind turbines have generated 2.5 terawatt hours (TWh) of electricity since the prototype 6MW direct drive turbine was installed at Høvsøre, Denmark in May 2011. To put the amount of electricity produced by its direct drive offshore wind turbines into perspective, Sieme

about 9 years ago
Nobelwind Starts Producing
Grid Connection

Nobelwind Starts Producing

The first MHI Vestas wind turbine has started producing power at the Nobelwind offshore wind farm in the Belgian North Sea on Monday, 9 January, Parkwind reported via social media. The 165MW offshore wind farm is expected to be completed in 2017 and will feature 50 MHI Vestas V112-3.3MW turbines ins

about 9 years ago
Roxtec Seals Dudgeon Deal
Grid Connection

Roxtec Seals Dudgeon Deal

Roxtec has secured a contract to deliver its safety seal solutions for the 402MW Dudgeon offshore wind farm project. Roxtec UK managing director Graham O’Hare said the firm will deliver cable transit systems to safeguard workers, structures and equipment on the wind farm’s substation platform. The d

about 9 years ago
UK Wind Beats Coal in 2016
Grid Connection

UK Wind Beats Coal in 2016

The UK generated more electricity from wind than from coal in the full calendar year of 2016, Carbon Brief analysis shows. The milestone is a first for the UK and reflects a collapse in coal generation, which contributed just 9.2% of UK electricity last year, with 11.5% from wind. The coal decline s

about 9 years ago
Vattenfall Tables Thanet Extension Plans
Grid Connection

Vattenfall Tables Thanet Extension Plans

Vattenfall has started developing a proposal for an extension to the existing and operational Thanet offshore wind farm located approximately 12 kilometres from the shore at Margate in Kent, UK. The extension would comprise addition of up to 34 turbines on the edges of the existing 300MW wind farm w

about 9 years ago
COBRAcable Converter Station Starts Taking Shape in Eemshaven
Grid Connection

COBRAcable Converter Station Starts Taking Shape in Eemshaven

TenneT and Energinet.dk have driven the first pile into the ground to kick off the construction of the Dutch converter station of the COBRAcable, a subsea electricity connection that will link the Dutch and Danish grids. The COBRAcable will have a capacity of 700MW, will be approximately 325 kilomet

about 9 years ago
  • 1
  • …
  • 163
  • 164
  • 165
  • …
  • 276