offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
AuthoritiesBusiness & FinanceTechnologyR&DWind Farm Update
Ecosse Scopes Contract for £1.2 Bln Transmission Link
Grid Connection

Ecosse Scopes Contract for £1.2 Bln Transmission Link

Ecosse Subsea Systems (ESS) has signed a Letter of Intent with ABB for a seabed clearance and trenching project in the north of Scotland. The Aberdeenshire-based subsea technology firm will prepare the route for the 100-mile interconnector cable at the centre of SHE Transmission’s £1.2 billion Caith

about 11 years ago
RWE to Submit Triton Knoll Cabling Application
Grid Connection

RWE to Submit Triton Knoll Cabling Application

German renewable energy developer, RWE Innogy , is expected to submit a planning application for the electrical system components of its wind farm offshore Lincolnshire this month. After receipt of the application, Planning Inspectorate will have 28 days to review the application and decide whether

about 11 years ago
Nemo to Interconnect Belgium and UK
Grid Connection

Nemo to Interconnect Belgium and UK

Elia, the Belgian electricity transmission system operator, and the UK National Grid will today sign a joint venture agreement to move ahead with the Nemo Link- the first electricity interconnector between the two countries. The interconnector, able to provide 1000 MW of capacity, will run 140 kilom

about 11 years ago
OWA Advises on Cable Burial Risk Management
Grid Connection

OWA Advises on Cable Burial Risk Management

The Carbon Trust’s Offshore Wind Accelerator (OWA) has published a new guidance on risk management of cable burial for the first time. The Cable Burial Risk Assessment (CBRA) Guidance offers a standardised, repeatable and qualitative method to improve risk management of subsea cables for offshore wi

about 11 years ago
CableFish to Reduce Cable Installation Costs
Grid Connection

CableFish to Reduce Cable Installation Costs

UK innovator, North Sea Systems, completed the first full scale trial of its novel CableFish in December, which was put through its paces at the European Marine Energy Centre (EMEC) in the turbulent waters around Orkney. The technology was welcomed by Scottish Energy Minister Fergus Ewing who said:

about 11 years ago
VolkerInfra Scores Burbo Bank Onshore Cabling Job
Grid Connection

VolkerInfra Scores Burbo Bank Onshore Cabling Job

Dong Energy has appointed VolkerInfra to install the onshore underground cables and associated fibre optic cables for Burbo Bank Extension offshore wind farm in Liverpool Bay. A 220kV export cable will connect Burbo Bank Extension’s offshore substation with Dong Energy’s onshore substation. From thi

about 11 years ago
DNV GL: 60% Integration of Renewables in EU Distribution Grids Feasible by 2030
Grid Connection

DNV GL: 60% Integration of Renewables in EU Distribution Grids Feasible by 2030

The integration of approximately 60% of renewables into the European electricity system will be feasible by 2030, but will come with an extensive expansion of infrastructure, including transmission and distribution networks as well as conventional backup generation, DNV GL said. The challenges of gr

about 11 years ago
Rambiz Installs Eneco Luchterduinen Transformer Station
Grid Connection

Rambiz Installs Eneco Luchterduinen Transformer Station

Rambiz crane vessel, owned by Belgian Scaldis, installed offshore high voltage station (OHVS) in Dutch waters yesterday morning. On Tuesday, the vessel arrived to port of Ijmuiden where it picked up the OHVS which is a part of Eneco Luchterduinen offshore wind farm. Weighting as much as four Boeing

about 11 years ago
Carnegie Turns On Perth Wave Energy Project
Grid Connection

Carnegie Turns On Perth Wave Energy Project

Australian renewable energy developer, Carnegie, formally opened its Perth Wave Energy Project today. The Perth Project was officially “switched-on” by Federal Minister for Industry and Science, the Hon Ian Macfarlane MP and the Commanding Officer of HMAS Stirling, Captain Angela Bond. The Australia

about 11 years ago
Borkum Riffgrund 1 Produces First Power
Grid Connection

Borkum Riffgrund 1 Produces First Power

Electricity has been generated and fed into the German grid for the first time from the offshore wind farm Borkum Riffgrund 1. Trine Borum Bojsen, Managing Director of DONG Energy in Germany and responsible for Wind Power, said: “Borkum Riffgrund 1 is our first German wind farm and we’re more than h

about 11 years ago
N-Sea to Carry Out UXO Survey at BorWin3
Grid Connection

N-Sea to Carry Out UXO Survey at BorWin3

DC Netz BorWin3 GmbH has awarded a contract to N-Sea Offshore Wind BV to undertake unexploded ordnance (UXO) surveys at BorWin3 site. Specifically, the work covers surveying of the seabed to help the identification and removal of undiscovered ordnance along the cable route of BorWin3. The planned Bo

about 11 years ago
RTE Looking for Assistance on Offshore Wind Connections
Grid Connection

RTE Looking for Assistance on Offshore Wind Connections

French transmission system operator, Réseau de Transport d’Électricité (RTE) is seeking contractor for connection of four offshore wind projects. Namely, the company is inviting tenders for project ownership assistance (AMOA) for the preparation and support of connections works for Fécamp, Saint-Naz

about 11 years ago
50Hertz Seeks Cable Laying Accompanying Services
Grid Connection

50Hertz Seeks Cable Laying Accompanying Services

50Hertz Transmission GmbH has issued a call for tenders for work on the grid connection of offshore wind farms in the German part of the Baltic Sea. As part of the West Cluster Adlergrund (CWA) offshore grid connection, 50 Hertz requires the construction control and supervision of onshore and offsho

about 11 years ago
EIB Invests GBP 51 Mln in Gwynt y Môr Transmission Link
Grid Connection

EIB Invests GBP 51 Mln in Gwynt y Môr Transmission Link

The European Investment Bank has agreed to provide GBP 51 million backing for the GBP 352 transmission link to the second largest wind farm in the world. The Gwynt y Môr offshore wind farm, located in Liverpool Bay, eight miles off the north Wales coast, will produce enough electricity to cater for

about 11 years ago
  • 1
  • …
  • 206
  • 207
  • 208
  • …
  • 276