offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceTechnologyWind Farm UpdateR&DAuthorities
JDR to Supply Sandbank OWF Inter-Array Cables
Grid Connection

JDR to Supply Sandbank OWF Inter-Array Cables

VBMS has awarded JDR the inter-array cable contract for the Vattenfall AB Sandbank offshore wind farm. JDR will design and manufacture 105 kilometres of inter-array cable, including a new coilable 630mm2 copper core cable and a range of cable accessories. The Sandbank offshore wind farm will be cons

about 12 years ago
Prysmian to Showcase Its Offshore Wind Cables at WindEnergy
Grid Connection

Prysmian to Showcase Its Offshore Wind Cables at WindEnergy

Prysmian Group will showcase its state-of-the-art range of products and services for the wind power industry at the 2014 edition of the WindEnergy Hamburg event in Hamburg (Germany) from September 23 to 26, hall A1 booth 122. Long term growth perspectives in the renewable sector and business develop

about 12 years ago
DNV GL Recommends Practice for Offshore HVDC Systems
Grid Connection

DNV GL Recommends Practice for Offshore HVDC Systems

New DNV GL guidelines and practices ensure safe connection of offshore wind to the transmission grid using High Voltage DC technology. DNV GL has together with the Swedish Transmission Research Institute (STRI) and ten industry players developed a methodology for technology qualification of offshore

about 12 years ago
Baltic 2 Offshore Substation Awaiting Installation in Kiel
Grid Connection

Baltic 2 Offshore Substation Awaiting Installation in Kiel

A 4,400-ton substation for the EnBW Baltic 2 offshore wind farm has been prepared for transport at the shipyard of Abu Dhabi Mar Kiel. Since a very good weather for transportation and installation offshore is expected in the next few days, the platform should be moved directly to the construction fi

about 12 years ago
Dutch-Danish Interconnector to Be Built
Grid Connection

Dutch-Danish Interconnector to Be Built

The Dutch transmission system operator TenneT TSO B.V. and its Danish counterpart Energinet.dk have given their final approval for the development of COBRAcable. This new, over 300-km-long subsea direct-current electricity connection (interconnector), will directly connect the Dutch and Danish power

about 12 years ago
Fugro Completes Two Tasks at Gwynt y Mor
Grid Connection

Fugro Completes Two Tasks at Gwynt y Mor

Fugro has undertaken two key tasks at the Gwynt y Môr offshore wind farm, successfully completing the trenching and burial of inter-array cables for CT Offshore and providing unexploded ordnance (UXO) survey support. Once complete, RWE Innogy’s 160-turbine Gwynt y Môr, in the Irish Sea off the North

about 12 years ago
Eneco Luchterduinen Project Update
Grid Connection

Eneco Luchterduinen Project Update

One of the Dutch offshore wind farms, Eneco Luchterduinen is taking shape, according to Eneco. Van Oord’s jack-up vessel Aeolus installed a total of 16 foundations by 8 September. Eneco added that they faced windy weather at the beginning of August, “but the last few weeks are very good. We had some

about 12 years ago
ABB Scores USD 800 Mln Caithness-Moray Cabling Deal
Grid Connection

ABB Scores USD 800 Mln Caithness-Moray Cabling Deal

ABB has won an order worth over $800 million from Scottish Hydro Electric (SHE) Transmission plc to provide the Caithness-Moray high-voltage direct current (HVDC) power transmission link, which will connect the electricity grid on either side of the Moray Firth in northern Scotland. This follows a f

about 12 years ago
RWE Releases Report on Triton Knoll Cable Connection
Grid Connection

RWE Releases Report on Triton Knoll Cable Connection

RWE Innogy published a report outlining the results of a study undertaken with National Grid which considered the merits of 17 different substations across the east coast of England. The report highlights why Bicker Fen near Boston is the best location to connect the Triton Knoll offshore wind farm

about 12 years ago
EMEC Makes New Animations for Wave and Tidal Test Sites
Grid Connection

EMEC Makes New Animations for Wave and Tidal Test Sites

EMEC offers a range of ready-made and cost-minimising test and demonstration facilities in major wave and tidal resources. Significant infrastructure investments have been made to make it as easy as possible for technology developers to learn by doing, with full confidentiality of performance data.

about 12 years ago
Germany to Allot Available Grid Connection Capacity
Grid Connection

Germany to Allot Available Grid Connection Capacity

German Federal Network Agency launched a new initiative to allocate the 1,722.7MW grid connection capacity for the offshore wind developers. The available capacity will allow the country to reach its offshore wind goal of 7.7 GW by 2020. According to the agency, interested parties have until 1 Octob

about 12 years ago
DOE Issues National Offshore Wind Energy Grid Interconnection Study
Grid Connection

DOE Issues National Offshore Wind Energy Grid Interconnection Study

The U.S. Energy Department (DOE) has released the first National Offshore Wind Energy Grid Interconnection Study(NOWEGIS). The NOWEGIS investigated the key economic and technological factors that will influence the integration of offshore wind energy onto the national grid. NOWEGIS suggests that the

about 12 years ago
Onshore Work on Dutch Wind Farm Substation Commences
Grid Connection

Onshore Work on Dutch Wind Farm Substation Commences

The onshore preparations for the new 129 MW Eneco Luchterduinen, a partnership of Eneco and Mitsubishi Corporation, offshore wind farm have entered a new stage. Pre-fabricated sub-modules for the Offshore High Voltage Substation (OHVS) have now been transported to the yard of Fabricom in Antwerp, Be

about 12 years ago
Siemens Signs Electrical System Infrastructure Deal for Dudgeon OWF
Grid Connection

Siemens Signs Electrical System Infrastructure Deal for Dudgeon OWF

Dudgeon Offshore Wind Limited has awarded the contract for the Electrical System Infrastructure for its Dudgeon Offshore Wind Farm to Siemens Transmission and Distribution Ltd. The contract covers engineering, procurement, construction and offshore hook-up of one onshore substation and one offshore

about 12 years ago
  • 1
  • …
  • 217
  • 218
  • 219
  • …
  • 276