offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Business & FinanceWind Farm UpdateVesselsContracts & TendersAuthoritiesR&DTechnology
Belgian Offshore Wind Transmission Specialist Joins New Jersey Project
Grid Connection

Belgian Offshore Wind Transmission Specialist Joins New Jersey Project

NextEra Energy Transmission MidAtlantic (NEETMA), a subsidiary of NextEra Energy Transmission, and WindGrid, a subsidiary of Elia Group, have signed a Memorandum of Understanding (MoU) on cooperation on a New Jersey offshore wind transmission project. Under the MoU, the companies will work together

about 3 years ago
Thor Wind Turbine
Grid Connection

Nexans Completes Seagreen Export Cable Works

France-headquartered Nexans has completed the installation of all the subsea cables and onshore cables on the 1,075 MW Seagreen wind farm offshore Scotland. Nexans has supplied and installed three 65-kilometre offshore export cables and three 20-kilometre onshore export cables for which the company

about 3 years ago
Thor Wind Turbine
Grid Connection

All Turbines Up at France’s First Offshore Wind Farm

Jan De Nul’s jack-up Vole au vent has now installed all 80 GE Haliade 150-6 MW wind turbines at the Saint-Nazaire wind farm site offshore France. Vole au vent transported the wind turbines from the Nantes-Saint Nazaire Port and installed them at the first commercial-scale offshore wind farm in Franc

about 3 years ago
Thor Wind Turbine
Grid Connection

DolWin Kappa Topside Touches Down

Transmission system operator TenneT has installed the DolWin kappa offshore platform off the coast of Lower Saxony, Germany. DolWin kappa will be the centrepiece of the 900 MW DolWin6 direct current link, which will bring offshore wind power from the German North Sea to land. After three years of co

about 3 years ago
Seiche on Marine Mammal Safety Mission at Hornsea Two
Grid Connection

Ofgem Selects Hornsea Two OFTO Preferred Bidder

Ofgem has selected Diamond Transmission Partners as the preferred bidder for the offshore transmission of the Hornsea Two offshore wind farm in the UK. The company now has to resolve certain matters before being granted the Offshore Transmission Owner (OFTO) license for the 1.3 GW project. Diamond T

about 3 years ago
Seagreen
Grid Connection

Seagreen Foundations Installation Passes Halfway Mark

Over 50 jacket foundations have been installed at the 1,075 MW Seagreen wind farm offshore Scotland, according to the latest press release from SSE Renewables. The three-legged jacket foundations, each weighing around 2,000 tonnes, will play a critical role in safely supporting the wind turbines dur

about 3 years ago
Thor Wind Turbine
Grid Connection

RTE and TransGrid to Provide Consultancy Services for Baltic Sea Energy Island

Energinet has awarded RTE International and TransGrid Solutions with contracts for consultative engineering and construction services for the Baltic Sea Energy Island project in Denmark. The tender was issued for consultancy services regarding technical requirements to improve multi-vendor multi-ter

about 3 years ago
Thor Wind Turbine
Grid Connection

Energinet, Gasunie to Speed Up Preparations for Danish-German Green Hydrogen Link

Danish transmission system operator (TSO) Energinet and Gasunie Deutschland have signed a Memorandum of Understanding (MoU) to work on the preparations for cross-border hydrogen infrastructure between Denmark and Germany, which will accelerate the preparatory work and put the countries’ green hydrog

about 3 years ago
Fugro to Work on First Mediterranean Floating Offshore Wind Project
Grid Connection

Fugro to Work on First Mediterranean Floating Offshore Wind Project

Fugro has won a contract with Renexia to carry out surveys at the 2.8 GW Med Wind project, the first floating offshore wind project in the Mediterranean. Fugro will perform marine geophysical and environmental surveys to acquire comprehensive geo-data at the proposed wind farm location in water dept

about 3 years ago
Denmark and Germany to Build Bornholm Energy Island Together
Grid Connection

Denmark and Germany to Build Bornholm Energy Island Together

Denmark will increase the planned offshore wind capacity at the Bornholm Energy Island from 2 GW to 3 GW and enable the transfer of electricity to the German grid, with two political agreements now in place to make that happen. The Danish government started exploring the possibility to raise the off

about 3 years ago
Thor Wind Turbine
Grid Connection

Prysmian’s 525 kV HVDC Cable System Passes Test

Prysmian Group has developed and tested its first 525 kV extruded subsea full cable system for High Voltage Direct Current (HVDC) applications. The company said that this innovation in cable technology will enable a massive increase of the maximum transmission capacity of bi-pole systems up to more

about 3 years ago
Thor Wind Turbine
Grid Connection

Ramboll, Primo Marine Win Consultancy Work on Subsea Cable Routes for Danish Energy Islands

Danish engineering company Ramboll and its Dutch counterpart Primo Marine have been awarded contracts for consultancy services on the subsea cable routes for the two energy islands planned to be established in Denmark. The contracts, valued at a total of EUR 828,362 and awarded by the transmission s

about 3 years ago
Thor Wind Turbine
Grid Connection

Royal IHC Lands Cable Lay Spread Order from Boskalis

Royal IHC has won a contract by Boskalis for the delivery of an advanced modular cable lay spread (MCLS) that will be used in the offshore wind industry. The cable lay system will be used for the installation of inter-array power cables and associated cable protection systems (CPS). Royal IHC will d

about 3 years ago
A close-up of NKT's HVDC subsea power cable
Grid Connection

50Hertz Opens Tender for Gennaker Export Cable Route Planning

50Hertz, German transmission system operator (TSO) in charge of offshore grid connections in the Baltic Sea, has opened a tender for the planning of the route for the subsea cable of the OST-6-1 grid connection. The OST-6-1 offshore grid project will connect the 927 MW Gennaker offshore wind farm, b

about 3 years ago
  • 1
  • …
  • 55
  • 56
  • 57
  • …
  • 276