
The Kriegers Flak Combined Grid Solution (CGS) is now completely connected to the grid and in operation. According to Energinet, the trial runs were successfully completed and the recent restart tests after a simulated power outage on both the Danish and the German sides. Kriegers Flak CGS connects

The Netherlands and Denmark have signed an Agreement of Intent (AoI) to together explore opportunities for an offshore energy hub in the North Sea. Under the deal, TenneT, Gasunie and Energinet will carry out further research on the development of the joint energy hub for connecting offshore wind fa

TenneT has commissioned subsea cable manufacturer Zhongtian Technology Submarine Cable (ZTT) for two offshore wind connections in Germany. ZTT will deliver cable systems to link offshore wind farms to HelWin beta and DolWin kappa converter platforms in the North Sea, with the cable routes being five

TenneT and a joint venture of ENGIE Solutions and Iemants have signed a contract to design, engineer, produce, deliver, transport, and install the Hollandse Kust West Alpha offshore transformer substation. Earlier this year, the consortium had won the contract for the construction and installation o

Mayflower Wind Energy LLC has selected Burns & McDonnell to carry out Front End Engineering Design (FEED) of the onshore substation and onshore cable system for the Mayflower Wind project off Massachusetts, US. Burns & McDonnell will also provide market engagement support for the project. Mayflower

50Hertz and Energinet, together with the coal-fired power plant Rostock have performed a live simulation of a restart of the power grid after a power outage in Continental Europe with voltage supplied from Denmark through Kriegers Flak Combined Grid Solution (CGS). According to 50Hertz, a land and s

The newly established AquaVentus association has presented a project to install 10 GW of offshore wind capacity in the German North Sea for the production of green hydrogen. 27 companies, research institutions, and organizations are part of the AquaVentus association. These include RWE, Shell, Sieme

TenneT, Statnett, and KfW have put the 1,400 MW NordLink interconnector between Norway and Germany into trial operation. The 623-kilometres-long high-voltage direct current (HVDC) transmission link will be used for the exchange of Norwegian hydropower and German wind energy. “NordLink is a beacon pr

Cable-monitoring company Marlinks has secured a contract to provide cable depth and temperature monitoring for the Norther offshore wind project in Belgium. Both the wind farm’s export and inter-array cables will be monitored using Marlinks’ technology. The company said that its DTS-based technology

UK energy market regulator Ofgem has opened a tender round to grant two offshore transmission licences to connect the Moray East and the Triton Knoll offshore wind farms to the UK grid. The tender process will consist of two stages for each project, an Enhanced Pre-Qualification (EPQ) stage, and an

TenneT TSO GmbH has issued a tender notice for the design, manufacture, installation, and commissioning of the BorWin6 converter platforms. Located in the North Sea Cluster 7, the 900 MW BorWin6 is scheduled to be commissioned by 2027. The offshore grid connection will collect the three-phase electr

Aibel and Keppel FELS have held a strike steel ceremony at Keppel FELS’ shipyard in Singapore to mark the start of construction of the DolWin5 high voltage direct current (HVDC) offshore converter platform. Transmission system operator TenneT selected the Aibel/Keppel FELS consortium to supply the o

The U.S. Department of Energy (DOE) has launched a Request for Information (RFI) process regarding the research needs for integration of large-scale offshore wind energy generation into the transmission grid. The purpose of the RFI, issued by DOE’s Wind Energy Technologies Office (WETO), is to solic

NKT has entered into a Preferred Supplier Agreement (PSA) as the main contractor to deliver and install export cable systems on an unnamed European offshore wind farm. Under the contract, NKT will deliver and install high-voltage DC on- and offshore export cable systems for the project. The potentia