offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Grid Connection

Loading filters...
Contracts & TendersWind Farm UpdateAuthoritiesBusiness & FinanceTechnology
TenneT Reveals Borssele Beta Topside Sail-Out Date
Grid Connection

TenneT Reveals Borssele Beta Topside Sail-Out Date

The Borssele Beta offshore substation topside will sail out from HSM Offshore’s yard in Schiedam to the installation site in the Dutch North Sea on 22 March, TenneT said. The 700MW offshore grid connection is scheduled to be operational on September 1. From then on, the 731.5MW Borssele III and IV w

about 6 years ago
WSP-in-Australia-Joins-Star-of-the-South-Offshore-Wind-Project
Grid Connection

WSP in Australia Joins Star of the South Offshore Wind Project

WSP in Australia has secured a contract to help design the onshore transmission network and grid connection of the Star of the South offshore wind farm. WSP will be supporting the power system studies, system integration and Front End Engineering Design of the onshore transmission assets for what is

about 6 years ago
Amprion Cleared to Start DolWin4 and BorWin4 Public Planning Preps
Grid Connection

Amprion Cleared to Start DolWin4 and BorWin4 Public Planning Preps

Germany’s Amprion has secured a waiver from relevant authorities allowing the transmission system operator to skip the regional planning procedure for the sections of DolWin4 and BorWin4 offshore grid connection systems between the North Sea coast (Hagermarsch) and the Emden area. Amprion can now st

about 6 years ago
Qingdao Hanhe Delivers First Cable for Jinwan Offshore Wind Farm
Grid Connection

Qingdao Hanhe Delivers First Cable for Jinwan Offshore Wind Farm

Qingdao Hanhe Cable has delivered the first lot of 220kV submarine cable for the Jinwan offshore wind project in China. According to the China-based company, the cable was delivered on 5 March. In total, Hanhe Cable will provide 34 kilometers of 220kV submarine cable and 76.92 kilometers of 35kV sub

about 6 years ago
Second SeaMade Substation Topside Touches Down
Grid Connection

Second SeaMade Substation Topside Touches Down

The second SeaMade offshore substation topside has been installed in the Seastar concession area in the Belgian North Sea. The wind farm’s first substation was installed in the Mermaid concession area at the beginning of March. Each with a weight of 1,200 tonnes, the substations transform the wind e

about 6 years ago
EU Sets Aside EUR 980 Million for Clean Energy Infrastructure
Grid Connection

EU Sets Aside EUR 980 Million for Clean Energy Infrastructure

The European Commission has released EUR 980 million of funding for key European energy infrastructure projects with major cross-border benefits. The EU funding comes from the Connecting Europe Facility (CEF), the European support programme for trans-European infrastructure. This is seen as a crucia

about 6 years ago
Scaldis Getting Ready to Install Second SeaMade Substation
Grid Connection

Scaldis Getting Ready to Install Second SeaMade Substation

Scaldis Salvage & Marine Contractors is currently preparing for the installation of the second offshore substation at the SeaMade wind farm in Belgium. The 487MW SeaMade wind farm is a combination of the 235MW Mermaid and the 252MW Seastar offshore wind projects. This second topside, which recently

about 6 years ago
Danes Pick Thor Export Cable Landfall Spot
Grid Connection

Danes Pick Thor Export Cable Landfall Spot

Danish transmission system operator Energinet and the Danish Energy Agency have decided that the export cables from the Thor offshore wind farm will have their landfall at Tuskær, north of Nissum Fjord. Accordingly, the possibility for a landfall south of Nissum Fjord has been cancelled. This decisi

about 6 years ago
Binhai South H3 Offshore Substation Stands
Grid Connection

Binhai South H3 Offshore Substation Stands

The installation of a jacket foundation and an offshore substation topside at the 300MW Binhai South H3 offshore wind farm in China’s Yellow Sea has been completed, Huadian Heavy Industries said. Huadian Heavy Industries is the main EPC contractor for the construction and installation of a part of t

about 6 years ago
Second SeaMade Substation Arrives in Vlissingen
Grid Connection

Second SeaMade Substation Arrives in Vlissingen

The second offshore substation for the SeaMade wind farm has arrived in Vlissingen, the Netherlands, from where it will leave for installation off Belgium. The substation destined for the Seastar offshore wind concession completed its trip from Engie Fabricom’s construction yard in Hoboken, Belgium,

about 6 years ago
HSM Offshore Loads Out Borssele Beta Topside
Grid Connection

HSM Offshore Loads Out Borssele Beta Topside

HSM Offshore has loaded out the Borssele Beta offshore substation topside at its yard in Schiedam, the Netherlands. The 700MW Borssele Beta high voltage substation will connect the 731.5MW Borssele 3 & 4 wind farm to the Dutch grid. The substation’s jacket foundation, also built by HSM Offshore, was

about 6 years ago
Global Offshore to Wire Kincardine Floating Wind Farm
Grid Connection

Global Offshore to Wire Kincardine Floating Wind Farm

Global Offshore, part of the Global Marine Group, has secured a contract with Spain’s Grupo Cobra for cable installation and burial at the Kincardine floating wind farm offshore Scotland. Utilising specialist cable installation vessel the Normand Clipper, the latest addition to its fleet, Global Off

about 6 years ago
EIB Loan for TenneT's Dutch Grid Expansion
Grid Connection

EIB Loan for TenneT’s Dutch Offshore Wind Grid Expansion

The European Investment Bank (EIB) has signed a EUR 250 million loan agreement with TenneT for the western section of the Zuidwest 380kV offshore grid project in the Netherlands. The financing will support the construction of a new 380kV transmission line, combined with a 150kV line for part of the

about 6 years ago
Van Oord Testing New Trencher Ahead of Dutch Offshore Wind Work
Grid Connection

Van Oord Testing New Trencher Ahead of Dutch Offshore Wind Work

Van Oord is conducting final tests with its Deep Dig-It trencher before the installation of cables at the Hollandse Kust (South) offshore wind farm zone. Van Oord is conducting final tests with the Tracked Remotely Operated Vehicle (TROV) in the Alexiahaven harbor, the Netherlands, in preparation fo

about 6 years ago
  • 1
  • …
  • 98
  • 99
  • 100
  • …
  • 276